Cisco Systems uBR10-LCP2-MC28C manual Cisco TAC Escalation Center

Page 27

Obtaining Technical Assistance

If you are a Cisco.com registered user, and you cannot resolve your technical issues by using the Cisco TAC Web Site, you can open a case online by using the TAC Case Open tool at this URL:

http://www.cisco.com/tac/caseopen

If you have Internet access, we recommend that you open P3 and P4 cases through the Cisco TAC Web Site.

Cisco TAC Escalation Center

The Cisco TAC Escalation Center addresses priority level 1 or priority level 2 issues. These classifications are assigned when severe network degradation significantly impacts business operations. When you contact the TAC Escalation Center with a P1 or P2 problem, a Cisco TAC engineer automatically opens a case.

To obtain a directory of toll-free Cisco TAC telephone numbers for your country, go to this URL:

http://www.cisco.com/warp/public/687/Directory/DirTAC.shtml

Before calling, please check with your network operations center to determine the level of Cisco support services to which your company is entitled: for example, SMARTnet, SMARTnet Onsite, or Network Supported Accounts (NSA). When you call the center, please have available your service agreement number and your product serial number.

Cisco uBR10-LCP2-MC28C Cable Interface Line Card for the Cisco uBR10012 Router

 

OL-4653-01

27

 

 

 

Image 27
Contents Purpose AudienceScope Cisco uBR10-LCP2-MC28C Overview ContentsQPSK, 16 QAM Cisco uBR10012 Router Chassis Slot Numbering MC28C Physical DescriptionLED Description Specifications Technical SpecificationsSafety Information and Warnings Electrical Equipment GuidelinesPreventing Electrostatic Discharge Damage Bewaar Deze Instructies Statement 1071-Warning DefinitionBewahren SIE Diese Hinweise GUT AUF Spara Dessa Anvisningar Tools and Parts Required Unpacking and PreparingRemoving a Cable Interface Line Card from the Chassis Captive screws Opening the Ejector Levers Make sure that you are using the ESD-preventive wrist strap Inserting the Cable Interface Line Card Closing the Ejector Levers Connecting the Cables Removing the Nuts and Washers 62668 58721 Connecting the Cables Page Related Documentation Obtaining DocumentationWorld Wide Web Documentation Feedback Obtaining Technical AssistanceDocumentation CD-ROM Ordering DocumentationTechnical Assistance Center Cisco.comCisco TAC Escalation Center Obtaining Technical Assistance