Cisco Systems installation instructions Installing the AVS 3120 on a Workbench or Tabletop

Page 5
Image 5
Contents Connecting AC Power, page Booting the AVS 3120, page Installing Your AVS 3120, page Connecting Cables, pageConfiguring Network Settings, page Setting the Time, page Unpacking and Inspecting the AVS 3120, pageIf the Product is Damaged Installing Your AVSUnpacking and Inspecting the AVS Attaching a Two-Post Rack Bracket to the AVS Installing the AVS 3120 on a Workbench or TabletopAttaching a Two-Post Rack Bracket to the AVS 3120 Figure 3-1 Attaching the Brackets to the Sides of the AVSInstalling the AVS 3120 on a Workbench or Tabletop Connecting Cables Connecting AC Power Booting with a Console Connected Booting the AVSEstablishing a Serial Console Connection 3-10 Configuring Network Settingsvelocityshow dns 3-11velocityset date tz timezone velocityshow timezone current3-12 Setting the TimeChecking the Front Panel LEDs IndicatorColor State3-14 Removing or Replacing an AVS