Cisco Systems
installation instructions
Installing the AVS 3120 on a Workbench or Tabletop
Install
Indicator
Connecting Cables
Configuring Network Settings
Connecting AC Power
Booting the AVS
Page 5
Page 4
Page 6
Image 5
Page 4
Page 6
Contents
Connecting AC Power, page Booting the AVS 3120, page
Installing Your AVS 3120, page Connecting Cables, page
Configuring Network Settings, page Setting the Time, page
Unpacking and Inspecting the AVS 3120, page
If the Product is Damaged
Installing Your AVS
Unpacking and Inspecting the AVS
Attaching a Two-Post Rack Bracket to the AVS
Installing the AVS 3120 on a Workbench or Tabletop
Attaching a Two-Post Rack Bracket to the AVS
3120
Figure 3-1 Attaching the Brackets to the Sides of the AVS
Installing the AVS 3120 on a Workbench or Tabletop
Connecting Cables
Connecting AC Power
Booting with a Console Connected
Booting the AVS
Establishing a Serial Console Connection
3-10
Configuring Network Settings
velocityshow dns
3-11
velocityset date tz timezone
velocityshow timezone current
3-12
Setting the Time
Checking the Front Panel LEDs
Indicator
Color
State
3-14
Removing or Replacing an AVS
Related pages
How can I find the Ersatzteilliste for Kettler EX3?
Check here
Top
Page
Image
Contents