Cisco Systems
AVS 3120
installation instructions
Removing or Replacing an AVS, 3-14
Install
Indicator
Connecting Cables
Configuring Network Settings
Connecting AC Power
Booting the AVS
Page 14
Page 13
Page 14
Image 14
Page 13
Page 14
Contents
Configuring Network Settings, page Setting the Time, page
Installing Your AVS 3120, page Connecting Cables, page
Connecting AC Power, page Booting the AVS 3120, page
Unpacking and Inspecting the AVS 3120, page
If the Product is Damaged
Installing Your AVS
Unpacking and Inspecting the AVS
Attaching a Two-Post Rack Bracket to the AVS
Installing the AVS 3120 on a Workbench or Tabletop
Attaching a Two-Post Rack Bracket to the AVS
Figure 3-1 Attaching the Brackets to the Sides of the AVS
3120
Installing the AVS 3120 on a Workbench or Tabletop
Connecting Cables
Connecting AC Power
Booting the AVS
Booting with a Console Connected
Establishing a Serial Console Connection
Configuring Network Settings
3-10
velocityset date tz timezone
3-11
velocityshow dns
velocityshow timezone current
Setting the Time
3-12
Color
Indicator
Checking the Front Panel LEDs
State
Removing or Replacing an AVS
3-14
Related pages
Troubleshooting for Samsung WW90M760NOA/EE
Performance Specifications for Anritsu S251B
Diagnostic Programs 11Error Codes and Description for Toshiba E205
Wiring Diagram for Desa BHDV37PC
How to Insert Memory Cards for Nextar N8-101
IR Sensor Installation for LightSpeed Technologies 850iR
Illustrated Parts List Model for Briggs & Stratton 071020
Language code list for Toshiba SD-KV550SU
Top
Page
Image
Contents