Cisco Systems AVS 3120 installation instructions Connecting AC Power

Page 7
Image 7
Contents Unpacking and Inspecting the AVS 3120, page Installing Your AVS 3120, page Connecting Cables, pageConnecting AC Power, page Booting the AVS 3120, page Configuring Network Settings, page Setting the Time, pageUnpacking and Inspecting the AVS Installing Your AVSIf the Product is Damaged Attaching a Two-Post Rack Bracket to the AVS Installing the AVS 3120 on a Workbench or TabletopAttaching a Two-Post Rack Bracket to the AVS 3120 Figure 3-1 Attaching the Brackets to the Sides of the AVSInstalling the AVS 3120 on a Workbench or Tabletop Connecting Cables Connecting AC Power Booting with a Console Connected Booting the AVSEstablishing a Serial Console Connection 3-10 Configuring Network Settingsvelocityshow timezone current 3-11velocityshow dns velocityset date tz timezone3-12 Setting the TimeState IndicatorChecking the Front Panel LEDs Color3-14 Removing or Replacing an AVS