Cabletron Systems manual Installing the Module into the SmartSwitch 9000 Chassis

Page 22

Installation

Installing the Module into the SmartSwitch 9000 Chassis

NOTE

To insure proper data transmission from the 9G421-02/9G429-02 module to the INB on the SmartSwitch 9000 backplane, two INB Terminator modules must be installed on the rear of the SmartSwitch 9000 chassis. If they have not previously been installed, refer to the INB Terminator Module Installation Guide for information and installation procedure.

To install the 9G421-02/9G429-02 module into the SmartSwitch 9000 chassis, follow these steps:

1.Remove the blank panel covering the slot in which you will install the module. If you are only installing one module, make sure the other module slots are covered. This action ensures proper airßow and cooling.

2.Attach one end of the ESD wrist strap (packaged with the SmartSwitch 9000 chassis) to your wrist. Plug the other end into the ESD Wrist Strap grounding receptacle in the lower right corner of the SmartSwitch 9000 chassis shown in Figure 2-5.

3.Grasp the module and slide it into the slot. Make sure that the moduleÕs circuit card is between the card guides, as shown in Figure 2-5.Check both the upper and lower tracks of the card. Make sure that the module slides in straight and engages the backplane connectors properly.

4.Lock down the top and bottom plastic tabs, as shown in Figure 2-5.

2-8

Image 22
Contents 9032344-02 Page Page Industry Canada Notice FCC NoticeVcci Notice Safety Information Class 1 Laser TransceiversDeclaration of Conformity Addendum Contents Chapter Lanview LEDs Appendix a Specifications CPUIntroduction Introduction Features Related Manuals Getting Help Your email addressIntroduction Tools Needed Unpacking the ModulePhysical Layout 9G421-02/9G429-02 Circuit BoardsUser Accessible Daughterboard Components DIP SwitchSwitch Function Description Removing the Daughterboard from the Motherboard Daughterboard Attached to the 9G421-02/9G429-02SMB-1 Prom Boot Prom Daughterboard Components Installing the Module into the SmartSwitch 9000 Chassis Installing the 9G421-02/9G429-02 Module Reset Switch Reset SwitchOperation SMB-1 Bus System Diagnostic ControllerSystem Management Buses SMB-10 BusDC/DC Converter SecureFast SmartSwitch ArchitectureINB Interface I960 Core Lanview LEDs 2lists the states of the INB Receive LED 4lists the states of the Port Receive LED Lanview LEDs Memory Technical SpecificationsNetwork Interfaces Service Regulatory CompliancePhysical DimensionsWeight EnvironmentSpecifications
Related manuals
Manual 26 pages 46.69 Kb Manual 14 pages 9.57 Kb