3 Zoning management

FIGURE 42 Edit HBA/Storage Accessibility Matrix window

5.Clear the check boxes selectively until you have defined the access groups and accessibility relationships you want in your zoning scheme.

6.When you are done making changes, click Next and the zoning Summary and Confirmation screen is displayed (Figure 43). Use the Print button if you would like a printed record of the zoning scheme.

7.Click Finish to create the zoning scheme. Click Cancel if you do not want to create this zoning scheme, and prefer to leave a previous scheme in place.

If you click Finish, allow time for the new scheme to be created. The Zone Access Map is updated with any new aliases, and a Zone commit succeeded confirmation dialog box is displayed.

8.Dismiss the confirmation dialog box. The Zone Access Map is updated to show the new accessibility relationships.

46

EZSwitchSetup Administrator’s Guide

 

53-1002744-01

Image 56
Contents EZSwitchSetup Brocade Communications Systems, Incorporated Contents Appendix a EZSwitchSetup Limitations Supported hardware and software This chapterHow this document is organized Text formatting What’s new in this documentDocument conventions Key terms Corporation Referenced Trademarks and ProductsAdditional information Getting technical helpBrocade resources Other industry resourcesDocument Feedback FT00X0054E9EZSwitchSetup Administrator’s Guide Introducing EZSwitchSetup Overview of EZSwitchSetupEZSwitchSetup software and hardware requirements Operating system Browser JRE versionSupported switches Configuring Internet ExplorerLanguage support for EZSwitchSetup EZSwitchSetup Administrator’s Guide 53-1002744-01 Language support for EZSwitchSetup Setting Up Your Switch Installing and running the EZSwitchSetup wizardLaunching the EZSwitchSetup wizard Connecting cables EZSwitchSetup introduction windowConnect Cables window Ethernet version, without serial cable Ioioi Discovering the switch First Discover Switch windowKeep the current switch IP configuration Confirming IP addresses Installing and running the EZSwitchSetup wizard Click Continue Configuring the switch Switch discovery failureSetting switch parameters EZSwitchSetup Setup Parameters windowZoning selection options Configuring zones on the switch Specifying devicesConnecting devices and completing the setup Specify Devices windowEZSwitchSetup Administrator’s Guide Ioioi Oioi Connecting devices and completing the setup Connecting devices and completing the setup Managing Your Switch Switch Manager overviewEZSwitchSetup Switch Manager components Task panelSwitch View ContentLaunching the EZSwitchSetup Switch Manager Status barLogging out Switch Manager sessionsLogging Viewing switch information Viewing the status indicator legend Viewing fan, temperature, and power supply statusPort status Port State LEDs Switch Information tab Port Information tabChanging switch information Adding a port license Managing devicesEZSwitchSetup Administrator’s Guide 53-1002744-01 Device connections Detailed Device informationAssigning and renaming device aliases Display Connections windowDevice aliases moved under Current Aliases Device alias in Zone Access Map Zoning managementViewing the zone access map Zone Access MapEditing the zoning configuration Edit HBA/Storage Accessibility Matrix is displayedZoning management Validating zoning configuration Restoring Typical ZoningAccessing Web Tools for advanced management Making EZSwitchSetup your default switch managerThis appendix General limitationsGeneral limitations Index EZSwitchSetup Administrator’s Guide EZSwitchSetup Administrator’s Guide 53-1002744-01 EZSwitchSetup Administrator’s Guide
Related manuals
Manual 8 pages 22.19 Kb