Paradyne IPD4000E installation instructions Chassis Specifications, Operating Requirements

Page 3

1.0 INSTALLATION

CAUTION Net to Net Technologies strongly recommends the use of proper electrostatic discharge (ESD) precautions when handling this equipment.

1.1 Unpack and Inspect the Equipment

The following components should be included:

1IPD4000E with 1 fan module and 12 blank plates

4Rubber Bumper Screws

2Rack Mount Brackets (either 19" or 23", as ordered)

10#6 Phillips Bracket Screws

8#10 Phillips Rack Screws

8#12 Phillips Rack Screws

CHASSIS SPECIFICATIONS

7" High x 17" Wide x 18" Deep (17.8 cm x 43.2 cm x 46 cm) 28 lbs (12.73 kg)

If there is visible damage, do not attempt to connect the device. Contact Customer Support: customers in Europe, the Middle East and Africa please call 44-0-1635- 570953 or email support-emea@nettonet.com; customers in the United States please call 1-877-638-2638 or email support@nettonet.com. All other customers please call 1- 603-427-0600 or email support@nettonet.com.

1.2 Select a Site for Installation

NOTE The IPD4000E is designed for installation in a Restricted Access area where admittance is limited to trained and authorized service personel.

OPERATING REQUIREMENTS

Operating Temperature: -40°F to 149°F (-40°C to 65°C)

Non-Operating Temperature: -40°F to 158°F (-40°C to 70°C)

Humidity: 5% to 95%, non-condensing

Altitude: -200ft to 16,500ft (-60m to 5,000m)

1.2.1 Tabletop

Insert the four [4] provided rubber bumper screws into the mounting holes at the bottom four corners of the IPD4000E chassis for surface grip. Position and secure all connecting cables such that they will not become a tripping hazard or pull loose from the chassis. Ensure that the air supply vents around the top and bottom edges of the chassis are not blocked.

IPD4000E BOTTOM VIEW

RUBBER BUMPER

SCREW

Side Top

Front

Rear

IPD4000E Installation Instructions 220-0000097 rev01

Page 3 of 17

Image 3
Contents IPD4000E Contents Operating Requirements Chassis SpecificationsRack Install Your Management Module Install Your Interface Modules Power Up Your IPD4000E Establish a Ground Connection DC Power Specifications Establish Your Uplink Connections Connect Your Subscriber Lines Detach the Velcro Strap Verify The Connections Document ContentsAdditional Information Customer Location Tech Support Email Tech Support Phone Regulatory ComplianceThis Class a product complies with European Norm EN55022