OnSite 2800 Series User Manual | 2 • Hardware installation |
|
|
| The UI and EUI power supplies automatically adjust to accept an | |
| input voltage from 100 to 240 VAC (50/60 Hz). | |
CAUTION | Verify that the proper voltage is present before plugging the | |
power cord into the receptacle. Failure to do so could result in | ||
| ||
| equipment damage. | |
|
|
3.Verify that the AC power cord included with your VPN Router is compatible with local standards. If it is not, refer to chapter 10, “Contacting Patton for assistance” on page 114 to find out how to replace it with a compatible power cord.
4.Connect the male end of the power cord to an appropriate power outlet.
Link | 100M | Activity |
| ||
0 |
| |
| Enet |
|
Power Run
Link
Router
100M | Activity |
| |
1 |
|
Enet |
|
|
|
| IPLink VPN Router |
PowerRun | Link 100M Activity | Link 100M Activity |
|
| Enet 0 | Enet 1 | Console |
Power | Enet 0 | Enet 1 | Console |
| |||
Run | 100M | 100M | port |
|
|
| |
Enet 0 | Enet 0 | Enet 1 | Enet 1 |
Link | Activity | Link | Activity |
Figure 8. VPN Router front panel LEDs and Console port locations (OnSite 2835 shown)
5.Verify that the green Power LED is lit (see figure 8).
Congratulations, you have finished installing the OnSite VPN Router! Now go to chapter 3, “Getting started with the OnSite Managed VPN Router” on page 38.
Installing the VPN router | 37 |