TP-Link TL-SG1016D/TL-SG1008, TL-SG1204D/TL-SG1016, TL-SG1048/TL-SG1024 manual Initialization

Page 22

Gigabit Unmanaged Switch

Note: The fgure is to illustrate the application and principle. The power plug you get from the package and the socket in your situation will comply with the regulation in your country, so they may differ from the fgure above.

4444 Initialization

After the device is powered on, it begins the Power-On Self-Test. A series of tests run automatically to ensure the device functions properly. During this time, its LED indica- tors will respond as follows:

All of the LED indicators will flash momentarily for one second, which represents a resetting of the system.

The Power LED indicator will light up.

17 Connection

Image 22
Contents Installation Guide Page Copyright & Trademarks FCC Statement CE Mark WarningAudience Related Document About this Installation GuideConventions Contents Cccccccccc Introduction FeaturesProduct Overview Appearance Front PanelRear Panel LEDsPower Socket Package Contents CCCCCCCCCCInstallationSafety Precautions Temperature/Humidity Site RequirementsInstallation Tools Lightening ProtectionDesktop Installation Product InstallationRack Installation Fffffffffff Rack Installation Cabling Reasonably Cccccccccc Lightning ProtectionRequirements for Cabling Outdoors Requirements for Cabling Indoors Connecting to the Grounding Bar Connect to GroundConnecting to the Ground via the Power Supply Equipotential BondingUse Lightning Arrester Lightning Protection CCCCCCCCCCConnection Verify InstallationPower On Ethernet PortInitialization Appendix a Troubleshooting Qqqq The Power LED is not litAppendix B Specifications FCC, CEAppendix C Technical Support Gigabit Unmanaged Switch Page F106503774\ Rev