Chapter 3 Installation
3.1 Installation
Follow these steps to install the switch:
!The surface must support at least 5kg
!The power source must be within 1.5m
!Check the power cable to make sure the connection to AC power
!Leave enough space for the ventilation
3.1.1 Desktop or Shelf Installation
1.Put the
2.Attach the cushioning feet on the bottom at each corner of the device.
3.Upturn the device, put it on the desktop.
3.1.2 Rack Installation
The
1.Attach a mounting bracket to each side of the
2.Sl ide the
3.U se the screws to secure the
24+2G Gigabit Managed Switch User's Guide |
Slot | 1 |
|
|
|
|
|
|
|
|
|
|
|
|
1000M |
| Slot | 2 | 1 | 3 |
|
|
|
|
|
|
|
|
| Act |
|
| Link |
| 5 | 7 |
|
|
|
|
|
|
|
| TX | RX | Act |
|
| 9 | 11 | 13 | 15 |
|
|
|
10/100M | FDX/Col | Link/Act |
|
|
|
|
|
|
| 17 | 19 | 21 | 23 |
|
|
|
|
|
|
|
|
|
|
|
|
| 100M |
2 | 4 |
|
|
|
|
|
|
|
|
|
|
| |
| 6 | 8 | 10 |
|
|
|
|
|
|
|
|
| |
|
|
| 12 | 14 |
|
|
|
|
| Power |
| ||
|
|
|
|
| 16 | 18 |
|
|
| Console | |||
|
|
|
|
|
|
| 20 | 22 |
|
| |||
|
|
|
|
|
|
|
|
|
|
| 24 | 24+2G | Gigabit Managed Switch |
|
|
|
|
|
|
|
|
|
|
|
|
|
Figure 3-1 Rack Installation
3.1.3 Power On
The
The internal power system of the
Caution:
As a precaution in the event of a power failure, unplug the switch. When the power resumed, plug the switch back in.