Site Preparation | Polycom Digital Signage Server Hardware Setup |
|
|
Hardware Kit: screws, cone washers, and cage nuts (from left to right)
•8 (Eight) M5 x 12 flat head screws
•2 (Two)
•22
•8 (Eight) M5 x 12 cone washers
•10 (Ten) M5 Cage nuts
NOTE: Use the hardware supplied with your specific rack if different from the hardware supplied in this kit.
The 4-post rack assembly consists of:
•A set of long, fixed rack brackets that attach directly to the rack itself.
•A set of
The 2-post rack assembly consists of:
•A set of long, fixed rack brackets.
•Three sets of short rack brackets that attach to the long fixed rack brackets. One of these sets has threaded holes (for placement in the front) to allow the appliance to be secured in the rack.
Site Preparation
Setup location, rack and appliance precautions
•Elevated Operating Ambient - If installed in a closed or