Polycom 725-78600-002A2 manual Step

Page 17

Rack Installation

Polycom Digital Signage Server Hardware Setup

 

 

NOTE: The following installation procedures for are for use with the rails and hardware provided in your ship kit. If different style rails are being used, or if your rack requires different hardware, refer to the instructions provided with your rail or rack ship kit.

NOTE: When removing the appliance from the 4-post rack, you will need to press down on the right locking tab and lift up on the left locking tab in order to release it from the rack. Carefully slide it out supporting the unit on both sides at all times.

Step 1

Locate the two rack rail brackets that came in your ship kit.

Attach the medium-sized adjustable rack bracket to the longer fixed rack bracket as shown.

Insert the tab on the rear of the medium adjustable rack bracket through the larger round opening on the back end of the long fixed rack bracket and slide the long bracket forward to keep the two brackets from coming apart. These rail brackets slide to accommodate different rack depths.

Rack bracket tab

Rear medium-sized adjustable bracket

Step 2

Insert a cage nut into each of the square holes in the rack you will be using as shown (three in the front and two in the rear). They click into place.

Attach the rack /rail assemblies to the rack using two M5 x 12 flat head screws and cone washers in the front and back. The convex side of the cone washers face toward the rack.

Polycom, Inc.

13

Image 17
Contents August 2010 3725-78600-002A2 USA Contents Regulatory Notices About Polycom Digital Signage Polycom Digital Signage SolutionPolycom Digital Signage Player Polycom Digital Signage ServerPolycom Digital Signage Remote Manager Architecture OverviewPolycom Digital Signage Web Controller Polycom Digital Signage AgentCustomer Support Polycom Global Services TelephonePolycom, Inc Hardware Installation Procedures Polycom Digital Signage Server Hardware SetupElectrical and General Safety Guidelines Safety Notice and WarningsRatings Environmental WarningElectrical and General Safety Guidelines Disposing of Battery Backup Units If Applicable Electrical and General Safety Guidelines Before you begin Unpacking the Appliance2-post rack assembly consists 4-post rack assembly consistsSetup location, rack and appliance precautions Site PreparationPost Rack Installation Rack InstallationStep Three cage nuts front Small fixed M5 x 12 flat head screws* two front and rear Rear Panel Connections Front Panel Operation Polycom Digital Signage Server Setup Polycom Digital Signage Server Software SetupInstallation Installing Remote ManagerPre-Installation Procedures on Windows Vista and Windows Polycom Digital Signage Server Software Setup Polycom, Inc Starting the Remote Manager Polycom, Inc Starting the Remote Manager Polycom, Inc Regulatory Notices USA Regulatory Notices Part 15 FCC Rules Regulatory NoticesPlugs Acts as Disconnect Device