Polycom 725-78600-002A2 manual Three cage nuts front

Page 18

Polycom Digital Signage Server Getting Started Guide

Rack Installation

 

 

Make sure the rack / rail assemblies and screws are aligned in the rack not only in the front and back, but are level in height on the left and right sides

for proper alignment for appliance installation.

Two M5 x 12

flat head screws and

two cone washers

(rear)

Outer fixed chassis rails

Two cage nuts

(rear)

4-post rack

Two M5 x 12 flat head screws and two cone washers

Three cage nuts (front)

Step 3

Align the fixed chassis rails on the appliance with the fixed rack rail brackets installed in the rack.

Carefully slide the appliance into the rack until you hear the locking tabs on each side of the fixed front rails click into place.

Push the appliance all the way into the rack until it stops.

Sefcure the unit in the rack using a 10-32 x 3/4" truss head screw (and a cage nut if not already installed) in the center hole on each rail.

2-Post Rack Installation

Unpack the appliance and locate the mounting hardware.

14

Polycom, Inc.

Image 18
Contents August 2010 3725-78600-002A2 USA Contents Regulatory Notices Polycom Digital Signage Player Polycom Digital Signage SolutionAbout Polycom Digital Signage Polycom Digital Signage ServerPolycom Digital Signage Web Controller Architecture OverviewPolycom Digital Signage Remote Manager Polycom Digital Signage AgentPolycom Global Services Telephone Customer SupportPolycom, Inc Polycom Digital Signage Server Hardware Setup Hardware Installation ProceduresRatings Safety Notice and WarningsElectrical and General Safety Guidelines Environmental WarningElectrical and General Safety Guidelines Disposing of Battery Backup Units If Applicable Electrical and General Safety Guidelines Unpacking the Appliance Before you begin Setup location, rack and appliance precautions 4-post rack assembly consists 2-post rack assembly consists Site PreparationRack Installation Post Rack InstallationStep Three cage nuts front Small fixed M5 x 12 flat head screws* two front and rear Rear Panel Connections Front Panel Operation Polycom Digital Signage Server Software Setup Polycom Digital Signage Server SetupInstalling Remote Manager Pre-Installation Procedures on Windows Vista and WindowsInstallation Polycom Digital Signage Server Software Setup Polycom, Inc Starting the Remote Manager Polycom, Inc Starting the Remote Manager Polycom, Inc Regulatory Notices Regulatory Notices USA Regulatory Notices Part 15 FCC RulesPlugs Acts as Disconnect Device