IES 1248 Support Notes
2. For Switch B on Floor 1:
Please follow the same steps to adding VLAN 10: port 3, fixed, untag; port 23, fixed, Tx tagging; port 24, fixed, Tx tagging”.
Add VLAN 20 to this switch, VLAN 20: port 4, fixed, untag; port 23, fixed, Tx tagging; port 24, fixed, Tx tagging.
74
All contents copyright (c) 2006 ZyXEL Communications Corporation.