1.For easier handling, first slide the server into the rack, then attach the cable management arm to the cable management arm bracket. If you attach the arm before loading the server in the rack, the arm may swing around and interfere with the loading process.
2.After you have loaded the server into the rack, attach one end of the cable management arm to the server's cable management arm bracket using two M6 x
Figure 3-15. Attaching the cable management arm to the cable management arm bracket
3.Align the other end of the cable management arm on the outside of the rear brace of the rack. Align a screw retaining plate on the inside of the rack. Attach the arm to the rack with two