D-Link DGS-1024D, DGS-1016D manual Safety Instructions

Page 8

D-Link DGS-1016D/DGS-1024D Unmanaged Gigabit Ethernet Switch

Safety Instructions (continued)

Always load the rack from the bottom up, and load the heaviest item in the rack first.

Make sure that the rack is level and stable before extending a component from the rack.

Use caution when pressing the component rail release latches and sliding a component into or out of a rack; the slide rails can pinch your fingers.

After a component is inserted into the rack, carefully extend the rail into a locking position, and then slide the component into the rack.

Do not overload the AC supply branch circuit that provides power to the rack. The total rack load should not exceed 80 percent of the branch circuit rating.

Ensure that proper airflow is provided to components in the rack.

Do not step on or stand on any component when servicing other components in a rack.

CAUTION: Never defeat the ground conductor or operate the equipment in the absence of a suitably installed ground conductor. Contact the appropriate electrical inspection authority or an electrician if you are uncertain that suitable grounding is available.

CAUTION: The system chassis must be positively grounded to the rack cabinet frame. Do not attempt to connect power to the system until grounding cables are connected. Completed power and safety ground wiring must be inspected by a qualified electrical inspector. An energy hazard will exist if the safety ground cable is omitted or disconnected.

viii

Image 8
Contents 16/24-Port 10/100/1000Mbps Gigabit Ethernet Switch ManualLink DGS-1016D/DGS-1024D Unmanaged Gigabit Ethernet Switch Contents Preface Safety Instructions Safety CautionsPage General Precautions for Rack Mountable Products Safety Instructions Protecting Against Electrostatic Discharge Switch Description SectionSwitch Features Advantages of QoS Gigabit Ethernet Technology802.1P and QoS Mapping QoS on the Switch Understanding QoSPage LED Indicators Front Panel View of the SwitchLED Indicators Front-Panel ComponentsCable Diagnostic LED Indicator Description Power Cable DiagnosticLink/Act 100Mbps/1000MbpsPower Input on Rear Panel Rear panel view of the SwitchInstallation Package ContentsBefore You Connect to the Network Mounting the Switch on a Rack Mounting the Switch to a RackAttaching the Rubber Feet Attaching the Rubber FeetProvide for Adequate Ventilation Power On Power FailureSection Cable QualitySwitch to End Node Switch connected to an end nodeSwitch to Hub or Switch Connect to another switch or hubConnecting to Network Backbone or Server Connection to a ServerAppendix GeneralPhysical and Environmental Performance Glossary Line speed See baud rate Page USA Warranty and Registration Information Page Page Page Page Page International Offices Belgium SpainHungary