American Power Conversion user manual Hardwire the Automatic Disconnect Switch

Page 7

Installation

Hardwire the Automatic Disconnect Switch



Step 

Remove the utility wiring panel located on top of unit.

• When required apply a strain relief grommet to the utility wiring panel holes.



Step 



Route the building wiring through the holes in the utility wiring panel.

Connect the 220 V building wiring to the Input

Hardwire terminal block.

Step 

Route the input wiring for the FRP/FLM through the

hole in the utility wiring panel.

• Connect the FRP/FLM input wiring to the Output Hardwire terminal block.



Step 

Reinstall the utility wiring panel. Secure the panel with the screw removed in Step .

Broadband Automatic Disconnect Switch User Manual

7

Image 7
Contents Broadband Automatic Disconnect Switch Page About this unit SafetySpecifications IntroductionUnpack InstallationSchematic Overview of the Automatic Disconnect Switch System Utility Power Connections Mount the Automatic Disconnect Switch on the WallHardwire the Automatic Disconnect Switch Cable System Connections Connector InstallationCoax Connection   Cable Modem Connection Start Up Indicators and ControlsPrimary/Secondary Access Panel OperationPrimary Status Cable ModemSecondary Status Problem and/or Possible Cause Solution Limited WarrantyFCC Compliance Notice Service