NETGEAR manual Applying AC Power, Installing a SFP Gbic Module into GS748T

Page 29

GS748T Smart Switch Hardware Installation Guide

Figure 4-3 Installing a SFP GBIC Module into GS748T

Step 6: Applying AC Power

Because he NETGEAR GS748T Gigabit Smart Switch has no ON/OFF switch, AC power must be controlled by means of the IEC power cord connection. Select an appropriate unswitched, grounded AC facility outlet so as to avoid any future inadvertent power interruptions. Use the following procedure to apply AC power:

1.Connect the female end of the supplied IEC AC power adapter cable to the power receptacle on the back of the switch.

2.Connect the 3-pronged end of the AC power adapter cable to the AC outlet.

When you apply power, the green Power LED on the switch front panel illuminates.

.

Note: If the Power LED does not light, check that the power cable is installed correctly and that the AC power supply is present. If this does not resolve the problem, refer

to Appendix A, “Troubleshooting”.

Installation

4-5

v1.0, January 2007

Image 29
Contents GS748T Smart Switch Hardware Installation Guide Statement of Conditions TrademarksCertificate of the Manufacturer/Importer Voluntary Control Council for Interference Vcci StatementCustomer Support EN 55 022 Declaration of ConformanceProduct and Publication Details Contents Appendix B Technical Specifications Appendix C Glossary Conventions, Formats, and Scope About This ManualHow to Use This Manual How to Print this Manual Revision History Chapter Introduction Overview Features GS748T Smart Switch Hardware Installation Guide Package Contents GS748T Smart Switch Hardware Installation Guide Front and Back Panels Chapter Physical DescriptionSFP Gbic Module LED Descriptions10/100/1000 Mbps RJ-45 Ports Front Panel LEDs Reset ButtonReset Button of the GS748T Gigabit Smart Switch Restore Factory Defaults ButtonGS748T Smart Switch Hardware Installation Guide GS748T Smart Switch Hardware Installation Guide Chapter Applications Desktop SwitchingExample of Backbone Switching Backbone SwitchingPreparing the Site Chapter InstallationInstalling the Switch in a Rack Installing the SwitchInstalling the Switch on a Flat Surface Connecting Devices to the Switch Checking the InstallationConnecting Devices to the Switch Installing a SFP Gbic ModuleInstalling a SFP Gbic Module into GS748T Applying AC PowerGS748T Smart Switch Hardware Installation Guide Troubleshooting Chart Appendix a TroubleshootingConfiguration Additional Troubleshooting SuggestionsSwitch Integrity Network Adapter CardsNetwork Protocol and Standards Compatibility Appendix B Technical SpecificationsManagement InterfacePower Supply Performance SpecificationsPhysical Specifications Environmental SpecificationsModules SafetyElectromagnetic Immunity GS748T Smart Switch Hardware Installation Guide Table C-1. Glossary Appendix C GlossaryIeee MAC GS748T Smart Switch Hardware Installation Guide Page Great America Parkway Santa Clara, CA 95054 USA
Related manuals
Manual 38 pages 38.49 Kb