
Chapter 4
Installation
This chapter describes the installation procedures for your NETGEAR GS748T Gigabit Smart Switch. Switch installation involves the following steps:
1.Preparing the site
2.Installing the switch
3.Checking the installation
4.Connecting devices to the switch
5.Installing an SFP GBIC module
6.Applying AC power
7.Switching management through a Web Browser or Utility Program (initial configuration)
Step 1: Preparing the Site
Before you install your switch, ensure that your operating environment meets the environmental requirements in Table 
Table 4-1.  Site Requirements
| Characteristics | Requirements | 
| 
 | 
 | 
| Mounting | 
 | 
| 
 | 
 | 
| Installations | Desktop: provide a flat table or shelf surface | 
| 
 | 
 | 
| 
 | |
| 
 | that is grounded and physically secure. You also need the  | 
| 
 | supplied with your switch. | 
| 
 | 
 | 
| Access | Locate the switch in a position that lets you access the front panel  | 
| 
 | ports, view the front panel LEDs, and access power connector. | 
| 
 | 
 | 
| Power source | Provide a power sourcea within 6 feet (1.8 meters) of the installation location. | 
| 
 | Ensure that the AC outlet is not controlled by a wall switch, which can | 
| 
 | accidentally turn off power to the outlet and the switch. | 
| 
 | 
 | 
| Environmental | 
 | 
| 
 | 
 |