Chapter 4
Installation
This chapter describes the installation procedures for your NETGEAR GS748T Gigabit Smart Switch. Switch installation involves the following steps:
1.Preparing the site
2.Installing the switch
3.Checking the installation
4.Connecting devices to the switch
5.Installing an SFP GBIC module
6.Applying AC power
7.Switching management through a Web Browser or Utility Program (initial configuration)
Step 1: Preparing the Site
Before you install your switch, ensure that your operating environment meets the environmental requirements in Table
Table 4-1. Site Requirements
Characteristics | Requirements |
|
|
Mounting |
|
|
|
Installations | Desktop: provide a flat table or shelf surface |
|
|
| |
| that is grounded and physically secure. You also need the |
| supplied with your switch. |
|
|
Access | Locate the switch in a position that lets you access the front panel |
| ports, view the front panel LEDs, and access power connector. |
|
|
Power source | Provide a power sourcea within 6 feet (1.8 meters) of the installation location. |
| Ensure that the AC outlet is not controlled by a wall switch, which can |
| accidentally turn off power to the outlet and the switch. |
|
|
Environmental |
|
|
|