NETGEAR GS748T manual Chapter Installation, Preparing the Site

Page 25

Chapter 4

Installation

This chapter describes the installation procedures for your NETGEAR GS748T Gigabit Smart Switch. Switch installation involves the following steps:

1.Preparing the site

2.Installing the switch

3.Checking the installation

4.Connecting devices to the switch

5.Installing an SFP GBIC module

6.Applying AC power

7.Switching management through a Web Browser or Utility Program (initial configuration)

Step 1: Preparing the Site

Before you install your switch, ensure that your operating environment meets the environmental requirements in Table 4-1.

Table 4-1. Site Requirements

Characteristics

Requirements

 

 

Mounting

 

 

 

Installations

Desktop: provide a flat table or shelf surface

 

 

 

Rack-mount: use a 19-inch (48.3-centimeter) EIA standard equipment rack

 

that is grounded and physically secure. You also need the rack-mount kit

 

supplied with your switch.

 

 

Access

Locate the switch in a position that lets you access the front panel RJ-45

 

ports, view the front panel LEDs, and access power connector.

 

 

Power source

Provide a power sourcea within 6 feet (1.8 meters) of the installation location.

 

Ensure that the AC outlet is not controlled by a wall switch, which can

 

accidentally turn off power to the outlet and the switch.

 

 

Environmental

 

 

 

4-1

v1.0, January 2007

Image 25
Contents GS748T Smart Switch Hardware Installation Guide Statement of Conditions TrademarksCertificate of the Manufacturer/Importer Voluntary Control Council for Interference Vcci StatementCustomer Support EN 55 022 Declaration of ConformanceProduct and Publication Details Contents Appendix B Technical Specifications Appendix C Glossary Conventions, Formats, and Scope About This ManualHow to Use This Manual How to Print this Manual Revision History Chapter Introduction Overview Features GS748T Smart Switch Hardware Installation Guide Package Contents GS748T Smart Switch Hardware Installation Guide Front and Back Panels Chapter Physical Description10/100/1000 Mbps RJ-45 Ports LED DescriptionsSFP Gbic Module Front Panel LEDs Reset ButtonReset Button of the GS748T Gigabit Smart Switch Restore Factory Defaults ButtonGS748T Smart Switch Hardware Installation Guide GS748T Smart Switch Hardware Installation Guide Chapter Applications Desktop SwitchingExample of Backbone Switching Backbone SwitchingPreparing the Site Chapter InstallationInstalling the Switch on a Flat Surface Installing the SwitchInstalling the Switch in a Rack Connecting Devices to the Switch Checking the InstallationConnecting Devices to the Switch Installing a SFP Gbic ModuleInstalling a SFP Gbic Module into GS748T Applying AC PowerGS748T Smart Switch Hardware Installation Guide Troubleshooting Chart Appendix a TroubleshootingConfiguration Additional Troubleshooting SuggestionsSwitch Integrity Network Adapter CardsNetwork Protocol and Standards Compatibility Appendix B Technical SpecificationsManagement InterfacePower Supply Performance SpecificationsPhysical Specifications Environmental SpecificationsElectromagnetic Immunity SafetyModules GS748T Smart Switch Hardware Installation Guide Table C-1. Glossary Appendix C GlossaryIeee MAC GS748T Smart Switch Hardware Installation Guide Page Great America Parkway Santa Clara, CA 95054 USA
Related manuals
Manual 38 pages 38.49 Kb