Chapter 2
Installation
This chapter describes the installation procedures for your NETGEAR Smart Switch. Switch installation involves the following steps:
“Step 1: Preparing the Site”
“Step 2: Installing the Switch”
“Step 3: Checking the Installation”
“Step 4: Connecting Devices to the Switch”
“Step 5: Installing an SFP GBIC Module”
“Step 6: Applying AC Power”
“Step 7: Managing the Switch through a Web Browser or the PC Utility for Initial Configuration”
Step 1: Preparing the Site
Before installing the switch, ensure the operating environment meets the requirements in the following table.
Table 2-1. Site Requirements
Characteristics Requirements
Mounting | • Desktop installations - Provide a flat table or shelf surface. |
| • |
| rack that is grounded and physically secure. The |
| is also required. |
|
|
Access | Locate the switch in a position that allows access to the front panel |
| to view the front panel LEDs, and easy safe access to the power connector. |
v1.0, October 2008