CHAPTER 3: INSTALLATION
This chapter describes the installation procedures for your NETGEAR Model FSM726 Managed Switch. Switch installation involves the following steps:
Step 1: Preparing the site
Step 2: Installing the switch
Step 3: Checking the installation
Step 4: Applying AC power
Step 5: Connecting devices to the switch
Step 6: Installing a GBIC module
Step 7: Connecting to the console port to manage the switch (initial configuration)
Step 1: Preparing the Site
Before you install your switch, be sure your operating environment meets the operating environment requirements in Table
Table
Characteristics | Requirements |
|
|
Mounting |
|
Desktop installations: | Provide a flat table or shelf surface. |
Use a | |
| and physically secure. You also need the |
| switch. |
|
|
Access | Locate the switch in a position that lets you access the front panel |
| view the front panel LEDs, and access the |
Power source | Provide a power source within 6 feet (1.8 meters) of the installation location. |
| Power specifications for the switch is shown in Appendix C. Be sure the AC |
| outlet is not controlled by a wall switch, which can accidentally turn off power |
| to the outlet and the switch. |
Environmental |
|
Temperature: | Install the switch in a dry area, with ambient temperature between 0 |
| and 40ºC (32 and 104ºF). Keep the switch away from heat sources |
| such as direct sunlight, warm air exhausts, |
Operating humidity: | The installation location should have a maximum relative humidity of |
| 90%, |
Ventilation: | Do not restrict airflow by covering or obstructing air inlets on the sides |
| of the switch. Keep at least 2 inches (5.08 centimeters) free on all sides |
| for cooling. |
| Be sure there is adequate airflow in the room or wiring closet where you |
| intend to install the switch. |
Operating conditions: | Keep the switch at least 6 ft (1.83 m) away from nearest source of |
| electromagnetic noise, such as a photocopy machine. |
Page 13 of 13