Liebert Decide on Placement of the OpenComms EM, 44.5mm Horizontal mounting Vertical mounting

Page 12

Installation

2.2Decide on Placement of the OpenComms EM

The unit may either be placed on a level surface or mounted on a wall, depending on the user’s appli- cation and the location of equipment to be connected and monitored. vEM-14 controllers may also be mounted in a rack.

If placing the unit on a level surface, such as a shelf or a desk, proceed to 2.3 - Make Connec- tions.

For wall or rack mounting, see the appropriate section for your model:

2.2.1 - Mounting the Unit on a Wall (EM / EM PDU Controllers)

or

2.2.2 - Mounting the Unit on a Wall or in a Rack (vEM-14 Controllers)

2.2.1Mounting the Unit on a Wall (EM / EM PDU Controllers)

The bottom of the EM / EM PDU controller has two holes to accommodate screws to secure the unit to a wall, either horizontally or vertically. You will need a screwdriver and any screws or bolts that will fit in the slots on the bottom of the unit.

1.Mark the wall for the mounting holes 1-3/4" (44.5mm) apart (see Figure 4).

2.Drill holes, if required, to install the two screws that will secure the unit to the wall. Clean up the debris.

3.If the wall material is not strong enough to hold the screws securely, use wall anchors.

4.Install the two screws—the screw heads must be small enough to slip through the larger, bottom portion of the mounting slot in the OpenComms EM (see Figure 4). The screws must also be large enough to extend over the edges of the top of the mounting slot.

5.Tighten the screws until they will hold the OpenComms EM tightly to the wall.

6.Hang the OpenComms EM on the screws, pushing the unit down until the screws are in the smaller, upper portion of the slot.

7.Proceed to 2.3 - Make Connections.

Figure 4 Mounting dimensions - EM / EM PDU Controllers

1-3/4"

(44.5mm)

horizontal mounting

1-3/4"

(44.5mm)

vertical mounting

6

Image 12
Contents Liebert OpenComms EM Page Table of Contents Getting Started with the WEB Interface Pinout GuidesFigures Page Introduction Dimensions and Mounting Overview EM & EM PDU Controllers Dimensions and Mounting Overview vEM-14 ControllersPower and port indicators VEM-14see Table OverviewConnectors on Back of Unit Description of indicators and connectorsIndicators Indicators summaryInstallation Considerations InstallationUnpacking and Preliminary Inspection Standard and optional components shipped with OpenComms EMDecide on Placement of the OpenComms EM Mounting the Unit on a Wall EM / EM PDU Controllers44.5mm Horizontal mounting Vertical mounting Mounting the Unit on a Wall or in a Rack vEM-14 Controllers Wall MountingRack Mounting Make Connections Consult Your Network Administrator Use IPSET.exe to Assign an IP AddressAssign AN IP Address Select a MethodUse ARP to Assign an IP Address Use Dhcp to Assign an IP AddressMain Parts of the Web Interface WEB Interface OverviewAddress bar Tabs Device Identification Main display Links Tabs Color-Coded StatusSummary of tab functions Color coding used in Web interfaceTemperature/Humidity Sensor Thresholds Examples of sensor limits temperature and humidity sensorsThresholds in the Web Interface Dry-Contact Sensor ThresholdsMP Advanced Power Strip Thresholds Examples of sensor limits MP Advanced power strip sensorsAmps Name Current Value Color Sensor Names and Status ButtonsSensor information name and status Buttons in the Web interfaceAddress bar Login window User Name PasswordOpen the Web Interface and Log Getting Started with the WEB InterfaceUpdate the Information View Summary DataTypes of Information Exit the Web InterfaceConfigure Sensors Sensors WindowCreate or Change Sensor Names Sensors tab Names Names for sensorsOn Sensor 1 port On Sensor 2 port Use these text boxesView Sensor Graphs Zoom in Feature Humidity sensor example Sensor graph humidity sensor examplePower Window EM PDU & vEM-14 Controllers Control ReceptaclesControl All Receptacles With One Button Control Individual ReceptaclesOn, Off, Reboot buttons Power strip port Receptacle to be linkedLink the Controls of Two Receptacles Linked receptacles PortConfigure Thresholds Power tab Links to set thresholds Select a power stripRefresh Critical & Warning limits Rearm Graph see Section View Power Strip Graphs Zoom in Feature Temperature sensor examplePower tab Port names Create or Change Port NamesMail Setup Alerts WindowModem Setup Snmp Trap Alerts Setup Security tab User drop-down list Enter & confirm password Security WindowCreate a New User Account Administrators Only Modify an Existing Account Administrators Only Change Password Users with Read/Write access Delete a User Account Administrators OnlySecurity tab Enter & confirm password Security tab User drop-down list Delete buttonDefault gateway Sys Info WindowNetwork Connectivity Sys Info tabSnmp Information Data Presentation Serial Ports Modem Setup and Pinout Guide Contact Closure Cable Pinout GuideSerial Cable Pinout Guide EM PDU & vEM-14 Controllers Pinout GuidesDownloading Firmware Updates Specifications OpenComms EM specificationsPage Ne t ItiTi n That

EM specifications

The Liebert EM is a state-of-the-art, modular and scalable cooling solution designed to meet the needs of today's data centers and IT environments. This innovative unit offers unmatched precision and flexibility, making it ideal for facilities that require meticulous temperature control and energy efficiency.

One of the main features of the Liebert EM is its modular design, allowing for easy expansion and customization based on the specific requirements of a facility. This scalability ensures that organizations can efficiently adapt to changing cooling demands without the need for significant infrastructure changes. The system can be configured in various capacities, making it suitable for spaces of different sizes and cooling needs.

Incorporating advanced technologies, the Liebert EM utilizes inverter-driven compressors, allowing for variable refrigeration capacity. This feature optimizes energy consumption, reducing operational costs while maintaining precise temperature control. The unit is designed with built-in smart controls that enable real-time monitoring and adjustments, ensuring enhanced performance and efficiency across the entire cooling system.

The Liebert EM also comes equipped with EC (Electronically Commutated) fans, which contribute to its energy efficiency by adjusting their speed according to the cooling load. This not only ensures adequate airflow but also minimizes energy waste, leading to lower overall operating costs.

Furthermore, the system features intelligent connectivity options that facilitate integration with existing building management systems. This capability allows for centralized monitoring and control, empowering facility managers to maintain optimal conditions and respond quickly to any fluctuations in temperature or humidity.

Safety and reliability are also paramount in the design of the Liebert EM. The unit includes comprehensive backup systems and redundancy features to ensure continuous operation even in the event of a component failure. This reliability is crucial for critical applications where downtime can result in significant losses.

In summary, the Liebert EM stands out as a versatile and high-performance cooling solution, equipped with advanced technologies that offer scalability, energy efficiency, and precise temperature control. Its modular design, coupled with intelligent control options, makes it an essential component for modern data centers looking to optimize their cooling infrastructure while ensuring reliability and reducing operational costs.