Installation Drawings
Figure 3 Top cable entry routing and installation order
|
|
| OUTPUT CONDUIT |
|
|
| INPUT CONDUIT |
|
|
| BYPASS CONDUIT |
|
|
| DC CONDUIT |
| DC (POSITIVE) |
| DC (POSITIVE) |
| DC (NEGATIVE) |
| |
|
|
| |
| GROUND (TOP ENTRY) |
| DC (NEGATIVE) |
|
|
| |
|
|
| BYPASS NEUTRAL |
| BYPASS NEUTRAL |
| BYPASS INPUT |
|
|
| |
FAULT BRACE |
| FAULT BRACE | (PHASE C) |
|
| ||
BYPASS INPUT | BYPASS INPUT | BYPASS INPUT | RECTIFIER INPUT |
|
| FAULT BRACE | (PHASE C) |
FAULT BRACE |
|
| |
RECTIFIER INPUT | RECTIFIER INPUT | RECTIFIER INPUT | OUTPUT (PHASE C) |
|
|
| |
FAULT BRACE |
| FAULT BRACE |
|
| OUTPUT |
| |
OUTPUT | OUTPUT |
| |
|
| ||
| GROUND |
|
|
| (BOTTOM ENTRY) |
|
|
| OUTPUT NEUTRAL |
| OUTPUT NEUTRAL |
FRONT VIEW | SIDE VIEW |
Recommended order of installation for cables: 1. DC Power
2. Bypass Neutral
3. Bypass Input Power (Phases
4. Rectifier Input Power (Phases
5. Output Power (Phases
6. Output Neutral
7. Ground
The cables must be routed around the fault braces. This is to prevent the cables from coming in contact with
other busbars.