Installation Drawings
Figure 4 Bottom cable entry routing and installation order
| DC (POSITIVE) |
|
|
| DC (NEGATIVE) |
| DC (POSITIVE) |
| GROUND (TOP ENTRY) | ||
| DC (NEGATIVE) | ||
|
|
| |
| BYPASS NEUTRAL |
| BYPASS NEUTRAL |
FAULT BRACE |
| FAULT BRACE | BYPASS INPUT |
| BYPASS INPUT | ||
| (PHASE C) | ||
BYPASS INPUT | BYPASS INPUT |
| |
|
| ||
|
| FAULT BRACE | RECTIFIER INPUT |
FAULT BRACE | RECTIFIER INPUT | (PHASE C) | |
RECTIFIER INPUT | RECTIFIER |
|
|
| INPUT | FAULT BRACE | OUTPUT (PHASE C) |
FAULT BRACE |
| OUTPUT |
|
OUTPUT | OUTPUT |
|
|
| GROUND (BOTTOM ENTRY) | OUTPUT NEUTRAL | |
|
|
| |
| OUTPUT NEUTRAL |
|
|
OUTPUT CONDUIT
INPUT CONDUIT
| BYPASS CONDUIT | |
FRONT VIEW | DC CONDUIT | |
SIDE VIEW | ||
|
Recommended order of installation for cables: 1.) Output Neutral
2.) Output Power (Phases
3.) Rectifier Input Power (Phases
4.) Bypass Input Power (Phases
5.) Bypass Neutral
6.) DC Power
7.) Ground
The cables must be routed around the fault braces. This is to prevent the cables from coming in contact with
other busbars.
12