LevelOne FSW-1609TFX, FSW-2409TFX user manual Installation

Page 13

Installation

The site where you install the hub stack may greatly affect its performance. When installing, consider the following pointers:

Install the Switch in a fairly cool and dry place. See Appendix B for the acceptable temperature and humidity operating ranges.

Install the Switch in a site free from strong electromagnetic field generators (such as motors), vibration, dust, and direct exposure to sunlight.

Leave at least 10cm of space at the front and rear of the hub for ventilation.

Install the Switch on a sturdy, level surface that can support its weight, or in an EIA standard-size equipment rack. For information on rack installation, see the next section, Rack Mounting.

When installing the Switch on a level surface, attach the rubber feet to the bottom of each device. The rubber feet cushion the hub and protect the hub case from scratching.

9

Image 13
Contents LevelOne Page FCC Warning Table of Contents Terms/Usage PurposeAbout this Guide Overview of this User’s Guide Introduction Fast Ethernet TechnologySwitching Technology Features Page Page Unpacking Unpacking and InstallationInstallation 100Base-FX Module Installation Rack Mounting Page Auto-MDI/MDIX Jacks Front PanelRear Panel LED Indicators Connecting the Switch PC to Switch10BASE-T Hub Hub to SwitchUsing straight cable Switch to Switch other devicesPort Speed & Duplex Mode General Technical SpecificationsPerformance RJ-45 Connector pin assignment RJ-45 PIN SpecificationStandard RJ-45 receptacle/connector