Magnum 4K8 Switches | Installation and User Guide | (10/04) | |||||||
The | |||||||||
the right rear of the unit and is equipped |
|
|
|
|
|
|
|
| |
with five (5) |
| A+ A- | B- B+ |
|
|
| |||
Fig C5.0). The primary terminals are |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
| ||
identified as positive (A+), negative (A- |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| ||
), and the secondary power terminals as |
|
|
|
|
|
|
|
| |
negative |
|
|
|
|
|
|
|
|
|
chassis “earth” or ground (GND), is a |
| GND | |||||||
|
|
|
|
|
|
|
|
threaded post with a #6 nut.
Figure C5.0: -48VDC Dual-Source, wiring connections to the External Terminal Block on a Magnum 48VDC with Dual-Source option
Note: The GND should be hooked up first. The 4K unit has a floating ground, so the user may elect to Ground either + or = terminal to suit the customer’s use.
Before connecting to Terminal block
The connection procedure is straightforward. Simply connect the DC leads to the Switch’s power terminals, positive (+) and negative
C5.1 UL Requirements
The following must be adhered to in order to conform to UL requirements:
1.Minimum 14 AWG cable for connection to a Centralized DC power source.
2.Fastening torque of the lugs on the terminal block: 9 inch pound max.
3.Centralized DC Power Source cable securement, use at least four cable ties to secure the cable to the rack at least 4 inches apart with the first one located within 6 inches of the terminal block.
C6.0 ORDERING INFORMATION
To order the optional
Example: Magnum 4K8-48VDC
Or
Similarly, order
Example: Magnum
C7.0 OPERATION
Operation of the
www . GarrettCom . com
39