Enterasys Networks VH-4802 manual Installation, Inspecting Your Shipment, Site Requirements

Page 31

2. INSTALLATION

Inspecting Your Shipment

When you receive the shipment of your switch, check the package contents and make sure you have the following items:

VH-4802 switch

Mounting ears and mounting screws

Four rubber feet

ESD wrist strap

Power cord

RS-232 null-modem cable

Product documentation

Site Requirements

Before you install the switch, make sure the site meets the following requirements:

Mounting

Provide a flat table, shelf surface, or an optional 19 in. (48.3 cm) equipment rack.

Use an EIA standard equipment rack that is grounded and physically secure.

Power source

Provide a power source within six feet (1.8 m) of the installation location. This source must provide 100 VAC to 240 VAC at 50 Hz to 60 Hz, for 90 VA minimum power. Power specifications for the switch are shown in Appendix A, “Technical Specifications.”

Primary voltage selection within the above ranges is automatic and requires no user action.

9033630

Installation 17

Image 31
Contents User Guide Fast Ethernet SwitchPage 9033630 FCC Notice Warnhinweis Faseroptikanschlüsse Optische Sicherheit Safety Information Wichtige Sicherheitshinweise Germany Enterasys NETWORKS, INC Program License Agreement 9033630 Declaration of Conformity Viii Table of Contents Index Conventions PrefacePurpose AudienceOther Conventions OrganizationDescription Product OverviewFeatures Tftp Front Panel Components Front PanelOptional Modules Optional Module Components Optional ModulesRear Panel Components Rear PanelFrame Buffering and Frame Latency Feature SummariesIeee 802.1D Bridge Spanning Tree ProtocolSoftware Download Configuration and Management InterfacesNon-Volatile Parameter Storage Port Mirroring RmonLEDs BootPFull Duplex Mode Auto-negotiationPort Trunking Class of ServiceFlow Control Virtual LANs VLANsFactory Default Settings Factory DefaultsGvrp Application Examples Client/Server Network Application Client/Server Network ApplicationLocal Backbone Application Local Backbone ApplicationInspecting Your Shipment InstallationSite Requirements Mounting the Switch on a Table or Shelf Mounting the Switch in a Rack Mounting the Switch in a RackInstalling an Optional Module into the Switch Installing an Optional Module into the SwitchConsole Port Out-of-Band Connections Connecting a Terminal to the Console PortIn-Band Connections Remote Management via the Console PortConnecting the Power Cord Powering the SwitchCopper Network Cable RequirementsFiber 10Base-T/100Base-TX Ports Base-LX Fiber SpecificationsFiber Uplink Modules 100Base-FX/1000Base-SX/LX Fiber PortsGeneral Appendix A. Technical SpecificationsPhysical Specifications Electrical SpecificationsTable A-1. RS-232 Console Port Pin Assignments Port SpecificationsConsole Port 10Base-T and 100Base-TX PortsMDI/MDI-X Crossover Cable Wiring Power Cord Set RequirementsGeneral Requirements Country-Specific Requirements Table A-3. Power Cord Set Requirements by CountryTechnical Specifications VH-4802 Appendix B. Flow Control Flow Control VH-4802 Term Definition Appendix C. Acronyms & AbbreviationsSnmp Index Index VH-4802 9033520 Index Index VH-4802 Page 150420-102 R01