Rack Mounting the Switch

Rack Mounting the Switch

To install the switch in a 19‐inch rack, you need:

Two rackmount brackets and mounting screws (rackmount kit) shipped with the switch.

Four user‐supplied screws to attach the switch to a standard 19‐inch rack.

Refer to “Torque Values” on page A‐4 for recommended torque values by screw size.

Guidelines for Rackmount Installation

The installation site must be within reach of the network cabling and meet the requirements listed below:

Appropriate grounded power receptacles must be located within 152 cm (5 ft) of the location.

A temperature of between 0°C (32°F) and 40°C (104°F) must be maintained at the installation site with fluctuations of less than 10°C (18°F) per hour.

Note: To ensure proper ventilation and prevent overheating, leave a minimum clearance space of 5.1 cm (2.0 in.) at the left, right, and rear of the switch.

Warning: Before rack-mounting the switch, ensure that the rack can support it without compromising stability. Otherwise, personal injury and/or equipment damage may result.

Advertencia: Antes de montar el equipo en el rack, asegurarse que el rack puede soportar su peso sin comprometer su propia estabilidad, de otra forma, daño personal o del equipo puede ocurrir.

Warnhinweis: Überzeugen Sie sich vor dem Einbau des Gerätes in das Rack von dessen Stabilität, ansonsten könnten Personenschäden oder Schäden am Gerät die Folge sein.

Attaching Brackets and Installing in Rack

Proceed as follows to install the switch into a 19‐inch rack:

1.Attach the rackmount brackets to the switch, as shown in Figure 3‐3, using the eight M3x6 mm flathead screws shipped with the switch. Refer to “Torque Values” on page A‐4 for recommended torque values by screw size.

3-6 Hardware Installation

Image 32
Contents SecureStack A2 Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Supplement to Product Instructions Vcci Notice Declaration of Conformity Enterasys NETWORKS, INC. Firmware License Agreement Viii Page Page Contents Figures Tables Xiv About This Guide Who Should Use This GuideHow to Use This Guide Related DocumentsConventions Used in This Guide Following conventions are used in this guideGetting Help Support@enterasys.comA2H123-24 Switch OverviewA2H123-24 Stackable Switch Redundant Power Supply Capability Switch Configuration Using WebViewConnectivity ManagementStandards Compatibility Lanview Diagnostic LEDsSwitch Configuration Using CLI Commands Network Requirements 10BASE-T Network1000BASE-T Network 100BASE-TX Network100BASE-FX Network Hardware Installation Required Tools Considerations Prior to InstallationUnpacking the Switch Installing the Switch on a Flat Surface Installing the Rubber FeetChassis Bottom, Rubber Feet Placement Guidelines for Flat Surface Installation Area Guidelines for Switch Installation on Flat SurfaceAttaching Brackets and Installing in Rack Rack Mounting the SwitchGuidelines for Rackmount Installation Connecting Stacking Cables Attaching the Rackmount BracketsStacking Cable Connections Configuring Switches in a Stack About SecureStack A2 Switch Operation in a StackRecommended Procedures for New and Existing Stacks Installing a New Stackable System of Up to Eight SwitchesAdding a New Switch to an Existing Stack Connecting AC and RPS-SYS Power AC PowerSwitch Rear View C2RPS-SYS Redundant Power System RPS coverplate Screw holes for coverplateStack Initialization Overview Connecting to Console Port for Local ManagementWhat Is Needed Connecting to an IBM or Compatible Device Parameter SettingConnecting to a VT Series Terminal Connecting an IBM PC or CompatibleConnecting to a Modem 10 Connecting a VT Series TerminalConnecting to the Network Connecting UTP Cables12 Connecting a UTP Cable Segment to RJ45 Port 13 Four-Wire Crossover Cable RJ45 Pinouts for 10/100BASE-TX 15 Eight-Wire Crossover Cable RJ45 Pinouts for 1000BASE-TX Connecting Fiber-Optic Cables to LC Ports 17 Cable Connection to LC Fiber-Optic Connectors Completing the Installation Initial Logon to Switch ManagementCompleting the Installation Hardware Installation Troubleshooting Using Lanview Lanview LEDs of A2H123-24LED 26/Stack Off RPS Troubleshooting Checklist Configuration Guide for proper setupConfiguration Guide for the IP address Using the Reset Switch Reset SwitchSpecifications Switch SpecificationsPhysical Fiber-Optic Specifications Console Port Pinout AssignmentsTorque Values Regulatory Compliance