Enterasys Networks A2H123-24 manual Switch Rear View

Page 39

Connecting AC and RPS-SYS Power

Figure 3-6 Switch Rear View

1 AC power cord 2 AC power connector 3 Connector for external redundant power supply

3.Observe the power CPU LED (not shown), located on the front panel. During the initialization, the CPU LED will start by illuminating solid amber, then start blinking green, then blinking amber, then blinking green again until the end of the initialization, and then turns solid green.

Note: If the CPU LED illuminates solid red, there was a critical failure. For more information about the LED indications and troubleshooting, refer to Chapter 4. If you need additional help, contact Enterasys Networks. Refer to “Getting Help” on page xviii for details.

If the switch is a standalone switch, it will take approximately 30 seconds for the switch to start up. If the switch is a stack Manager, it can take up to 3 minutes or more to start up, depending on the number of Member switches in the stack.

SecureStack A2 Installation Guide 3-13

Image 39
Contents SecureStack A2 Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Supplement to Product Instructions Vcci Notice Declaration of Conformity Enterasys NETWORKS, INC. Firmware License Agreement Viii Page Page Contents Figures Tables Xiv Who Should Use This Guide About This GuideRelated Documents How to Use This GuideFollowing conventions are used in this guide Conventions Used in This GuideSupport@enterasys.com Getting HelpOverview A2H123-24 SwitchA2H123-24 Stackable Switch Management Redundant Power Supply CapabilitySwitch Configuration Using WebView ConnectivityLanview Diagnostic LEDs Switch Configuration Using CLI CommandsStandards Compatibility 10BASE-T Network Network Requirements100BASE-TX Network 100BASE-FX Network1000BASE-T Network Hardware Installation Considerations Prior to Installation Unpacking the SwitchRequired Tools Installing the Rubber Feet Installing the Switch on a Flat SurfaceChassis Bottom, Rubber Feet Placement Area Guidelines for Switch Installation on Flat Surface Guidelines for Flat Surface InstallationRack Mounting the Switch Guidelines for Rackmount InstallationAttaching Brackets and Installing in Rack Attaching the Rackmount Brackets Connecting Stacking CablesStacking Cable Connections About SecureStack A2 Switch Operation in a Stack Configuring Switches in a Stack Installing a New Stackable System of Up to Eight Switches Recommended Procedures for New and Existing StacksAdding a New Switch to an Existing Stack AC Power Connecting AC and RPS-SYS PowerSwitch Rear View RPS coverplate Screw holes for coverplate C2RPS-SYS Redundant Power SystemConnecting to Console Port for Local Management What Is NeededStack Initialization Overview Parameter Setting Connecting to an IBM or Compatible DeviceConnecting an IBM PC or Compatible Connecting to a VT Series Terminal10 Connecting a VT Series Terminal Connecting to a ModemConnecting UTP Cables Connecting to the Network12 Connecting a UTP Cable Segment to RJ45 Port 13 Four-Wire Crossover Cable RJ45 Pinouts for 10/100BASE-TX 15 Eight-Wire Crossover Cable RJ45 Pinouts for 1000BASE-TX Connecting Fiber-Optic Cables to LC Ports 17 Cable Connection to LC Fiber-Optic Connectors Initial Logon to Switch Management Completing the InstallationCompleting the Installation Hardware Installation Troubleshooting Lanview LEDs of A2H123-24 Using LanviewLED 26/Stack Off RPS Configuration Guide for proper setup Troubleshooting ChecklistConfiguration Guide for the IP address Reset Switch Using the Reset SwitchSwitch Specifications SpecificationsPhysical Console Port Pinout Assignments Fiber-Optic SpecificationsRegulatory Compliance Torque Values