Enterasys Networks A2H123-24 Connecting to Console Port for Local Management, What Is Needed

Page 41

Connecting to Console Port for Local Management

Stack Initialization Overview

When you install and connect all the stacking cables to the switches in the stack before applying power to the switches, the following occurs:

The switch that will manage (Manager) the stack is automatically established with all other switches established as Member switches in the stack. When the switches complete their initializations, one of the switches in the stack will illuminate its Manager LED, indicating that it is the stack Manager. The Manager LED on each Member switch will be off.

The hierarchy of the switches that will function as backup Manager is also determined in case the current Manager malfunctions, is powered down, or is disconnected from the stack.

The Console port on each Member switch will provide only the unit number. Only the Console port on the Manager switch is active and provides a CLI for out‐of band configuration to set the IP address, password, and other settings.

Once you know which switch is the Manager, proceed to “Connecting to Console Port for Local Management” on page 3‐15.

Connecting to Console Port for Local Management

This section describes how to connect an RS232 DTE interface cable from a PC, a VT series terminal, or a modem to an A2H123‐24 for out‐of‐band sessions using CLI commands.

Note: When switches are connected in a stack configuration and all stacking cables are connected before powering up the switches, one switch in the stack will be automatically designated as the Manager of the stack and its Console port will remain active. All other switches will become Member switches and their Console ports will be deactivated.

What Is Needed

The following is a list of user‐supplied DTE interface cables that may be needed to connect the DB9 male Console port connector on the switch. The cables are terminated by a DB9 female connector at one end, and by one of three type connectors at the other end, depending on the type connection needed for the remote device. The cables that may be needed are as follows:

DB9 female‐to‐DB9 female

DB9 female‐to‐DB25 female

DB9 female‐to‐DB25 male

Using a DTE modem DB9 female‐to‐DB9 female cable, you can connect products equipped with a DB9 DTE male console port to an IBM or compatible PC running a VT series emulation software package.

SecureStack A2 Installation Guide 3-15

Image 41
Contents SecureStack A2 Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Supplement to Product Instructions Vcci Notice Declaration of Conformity Enterasys NETWORKS, INC. Firmware License Agreement Viii Page Page Contents Figures Tables Xiv Who Should Use This Guide About This GuideRelated Documents How to Use This GuideFollowing conventions are used in this guide Conventions Used in This GuideSupport@enterasys.com Getting HelpOverview A2H123-24 SwitchA2H123-24 Stackable Switch Switch Configuration Using WebView Redundant Power Supply CapabilityConnectivity ManagementStandards Compatibility Lanview Diagnostic LEDsSwitch Configuration Using CLI Commands 10BASE-T Network Network Requirements1000BASE-T Network 100BASE-TX Network100BASE-FX Network Hardware Installation Required Tools Considerations Prior to InstallationUnpacking the Switch Installing the Rubber Feet Installing the Switch on a Flat SurfaceChassis Bottom, Rubber Feet Placement Area Guidelines for Switch Installation on Flat Surface Guidelines for Flat Surface InstallationAttaching Brackets and Installing in Rack Rack Mounting the SwitchGuidelines for Rackmount Installation Attaching the Rackmount Brackets Connecting Stacking CablesStacking Cable Connections About SecureStack A2 Switch Operation in a Stack Configuring Switches in a StackInstalling a New Stackable System of Up to Eight Switches Recommended Procedures for New and Existing StacksAdding a New Switch to an Existing Stack AC Power Connecting AC and RPS-SYS PowerSwitch Rear View RPS coverplate Screw holes for coverplate C2RPS-SYS Redundant Power SystemStack Initialization Overview Connecting to Console Port for Local ManagementWhat Is Needed Parameter Setting Connecting to an IBM or Compatible DeviceConnecting an IBM PC or Compatible Connecting to a VT Series Terminal10 Connecting a VT Series Terminal Connecting to a ModemConnecting UTP Cables Connecting to the Network12 Connecting a UTP Cable Segment to RJ45 Port 13 Four-Wire Crossover Cable RJ45 Pinouts for 10/100BASE-TX 15 Eight-Wire Crossover Cable RJ45 Pinouts for 1000BASE-TX Connecting Fiber-Optic Cables to LC Ports 17 Cable Connection to LC Fiber-Optic Connectors Initial Logon to Switch Management Completing the InstallationCompleting the Installation Hardware Installation Troubleshooting Lanview LEDs of A2H123-24 Using LanviewLED 26/Stack Off RPS Configuration Guide for proper setup Troubleshooting ChecklistConfiguration Guide for the IP address Reset Switch Using the Reset SwitchSwitch Specifications SpecificationsPhysical Console Port Pinout Assignments Fiber-Optic SpecificationsRegulatory Compliance Torque Values