3.3 Site Requirements

Consider the following site requirements for proper installation.

3.3.1 Environmental Requirements

Choose a clean, dry, dust-free area location. Avoid direct sunlight, heat sources, or areas with high levels of electromagnetic interference. Failure to observe these limits may cause damage to the switch and may void the warranty.

3.3.2 Power

Make sure the power source adheres to the following guidelines:

Outlet: Properly grounded, located near the switch, and easily accessible

Power: Auto Switching 100-240 VAC, 50/60 Hz, maximum 225 watts

Frequency range: 50/60 Hz

3.3.3 Cooling and Airflow

The IC3624PWR PoE switch use internal fans for air-cooling. Do not restrict airflow by covering or obstructing air vents on the sides of the switch.

Operating Temperature: 32° to 104°F (0° to 40°C)

Relative Humidity: 10% to 90% non-condensing

3.3.4 Rack Mounting

Before mounting the switch in a rack follow these general precautions:

Size: 17.3 x 9.9 x 1.7 in (440 x 253 x 43 mm)

Weight: 9.5 lb (4.3 kg)

Temperature: The temperature within a rack assembly may be higher than the ambient room temperature check that the rack-environment temperature is within the specified operating temperature range remains below 104°F (40°C).

Clearance: Clear all obstructions, such as other equipment or cables, block airflow to or from the vents of the switch. Be sure there is adequate clearance for servicing the switch.

Mechanical Loading: Do not place any equipment on top of a rack-mounted unit.

Circuit Overloading: Be sure that the supply circuit to the rack assembly is not overloaded.

Grounding: Rack-mounted equipment should be properly grounded. Particular attention should be given to supply connections other than direct connections to the mains.

IntraCore IC3624PWR Layer 2 PoE Switch with Dual Gigabit

Image 13
Contents IntraCore IC3624PWR Technical Support IntraCore IC3624PWRTable of Contents Page Page Page Introduction FeaturesConnectivity Ports Network Management OptionsPerformance ManagementNetwork Planning Management Access OverviewManagement Method Advantages Disadvantages Snmp AccessSnmp Protocol ProtocolsInstallation Overview Hardware Installation and SetupSafety Recommendations Site Requirements PowerEnvironmental Requirements Cooling and AirflowUnpacking and Inspecting Preparing for InstallationMounting the Switch in a Rack Installing the SwitchRecommended Tools Desktop or Shelf Mounting Applying PowerEthernet Cabling Connecting to the Console PortSwitch’s 9-Pin Serial Port Null Modem PC’s 9-Pin DTE Port Wiring Map for Serial CableConnecting to PCs, Servers, Hubs and Switches Connecting Network DevicesTwisted-Pair Devices Cable GuidelinesInterpreting LEDs Network Wiring ConnectionsFast Ethernet Ports Connectivity GuidelinesCombo Ports Cable Labeling and Connection Records Connecting to the Switch Configuring the SwitchDirect Access Page Initial Logon Connection SettingsPage General Information Menu Using the InterfaceIntraCore IC3624PWR Layer 2 PoE Switch with Dual Gigabit Administration Information Basic Configuration MenuHeading Description Hardware InformationAdministration Configuration Snmp Configuration IP ConfigurationMap Main Menu-Basic Configuration Menu-IP Configuration Map Main Menu-Basic Configuration Menu-SNMP ConfigurationPage Snmp Management Configuration Trap Configuration Port Link Down Trap Map Main Menu-Basic Configuration Menu-System Security Port ConfigurationForwarding DB Map Main Menu-Basic Configuration Menu-Forwarding DBSntp Configuration ARP Table Map Main Menu-Basic Configuration Menu-SNTP ConfigurationMap Main Menu-Basic Configuration- ARP Table Advanced Switch ConfigurationMap Main Menu-Advanced Switch Configuration Vlan Table Configuration Map Main Menu-Advanced Switch Configuration-VLAN ManagementVlan Management Map Main Menu-Advanced Switch Configuration-VLAN Management Vlan Port Configuration Link Aggregation Map Main Menu-Advanced Switch Configuration-Link AggregationSet Port Priority Map Main Menu-Advanced Switch Configuration-Port Monitoring Mstp ConfigurationPort Monitoring Page Commands Rapid Spanning Tree Cist ConfigurationCist Basic Port Configuration Advanced Cist Port Configuration IntraCore IC3624PWR Layer 2 PoE Switch with Dual Gigabit Designated Topology Information Regional Topology Information Classifier Access List ConfigurationClassifier Configuration Menu Dscp Profile Action Classifier GroupNo Match Action Out Profile Action Port List Policy Quality of Service ConfigurationMapping Method Storm Control Map Main Menu-Advanced Switch Configuration-Storm ControlScheduling Method NAS ID 8 802.1 Port Based Access ControlIgmp Snooping Map Main Menu-Advanced Switch Configuration-IGMP SnoopingShow Igmp Snooping Vlan Filter Table Show Router Port Table Power over EthernetPoE Port Configuration PoE Global Configuration Map Main Menu-Statistics StatisticsMap Main Menu-Tools-TFTP Software Upgrade Tftp Software UpgradeTools Map Main Menu-ToolsMap Main Menu-Tools-Configuration File Upload/Download Configuration File Upload/DownloadMap Main Menu-Tools-System Reboot System RebootReboot Type Ping ExecutionMap Main Menu-Tools-System System LogMap Main Menu-Tools-Save Configuration to Flash Save ConfigurationRun CLI Diagnosing Switch Indicators Appendix a Basic TroubleshootingPower and Cooling Problems InstallationIntraCore IC3624PWR Layer 2 PoE Switch with Dual Gigabit Physical Characteristics Appendix B SpecificationsPerformance Management Features L2+ SwitchingStandards CompliancesTwisted-Pair Cable and Pin Assignments Appendix C Cables and Pin AssignmentsPin Assignments for 10BaseT/100BaseTX Crossover Wiring Straight-Through WiringPin Assignments for 1000BaseT Pin Adjusting Existing Category 5 Cabling to Run 1000BaseT Cable Testing for Existing Category 5 CableFiber Standards Page FCC Compliance Statement Important Safety Instructions Appendix D FCC Compliance and Warranty StatementsIntraCore Warranty Statement Appendix E. Online Warranty Registration