The table below shows the 1000BaseT MDI and MDI-X port pinouts. These ports require that all four pairs of wires be connected. Note that for 1000BaseT operation, all four pairs of wires are used for both transmit and receive.

Use 100-ohm Category 5, 5e or 6 unshielded twisted-pair (UTP) or shielded twisted-pair (STP) cable for 1000BaseT connections. The length of any twisted-pair connection must not exceed 100 meters (328 feet).

Pin

MDI Signal Name

MDI-X Signal Name

 

 

 

1

Bi-directional Data One Plus (BI_D1+)

Bi-directional Data Two Plus (BI_D2+)

 

 

 

2

Bi-directional Data One Minus (BI_D1-)

Bi-directional Data Two Minus (BI_D2-)

 

 

 

3

Bi-directional Data Two Plus (BI_D2+)

Bi-directional Data One Plus (BI_D1+)

 

 

 

4

Bi-directional Data Three Plus (BI_D3+)

Bi-directional Data Four Plus (BI_D4+)

 

 

 

5

Bi-directional Data Three Minus (BI_D3-)

Bi-directional Data Four Minus (BI_D4-)

 

 

 

6

Bi-directional Data Two Minus (BI_D2-)

Bi-directional Data One Minus (BI_D1-)

 

 

 

7

Bi-directional Data Four Plus (BI_D4+)

Bi-directional Data Three Plus (BI_D3+)

 

 

 

8

Bi-directional Data Four Minus (BI_D4-)

Bi-directional Data Three Minus (BI_D3-)

 

 

 

C.3 Cable Testing for Existing Category 5 Cable

Installed Category 5 cabling must pass tests for Attenuation, Near-End Crosstalk (NEXT), and Far-End Crosstalk (FEXT). This cable testing specifications are contained in the ANSI/TIA/EIA-TSB-67 standard. Cables must pass test parameters for Return Loss and Equal-Level Far-End Crosstalk (ELFEXT). These tests are contained in the ANSI/TIA/EIA-TSB-95 Bulletin, “The Additional Transmission Performance Guidelines for 100 Ohm 4-Pair Category 5 Cabling.”

Note: When testing the cable installation, be sure to include all patch cables between switches and end devices.

C.3.1 Adjusting Existing Category 5 Cabling to Run 1000BaseT

If your existing Category 5 installation does not meet one of the test parameters for 1000BaseT, follow these measures to correct the problem:

Replace any Category 5 patch cables with high-performance Category 5e or Category 6 cables.

Reduce the number of connectors used in the link.

Reconnect some of the connectors in the link.

C.4 Fiber Standards

The current TIA (Telecommunications Industry Association) 568-A specification on optical fiber cabling consists of one recognized cable type for horizontal subsystems and two cable types for backbone subsystems.

Horizontal 62.5/125 micron multimode (two fibers per outlet).

Backbone 62.5/125 micron multimode or singlemode.

IntraCore IC3624PWR Layer 2 PoE Switch with Dual Gigabit

Image 83
Contents IntraCore IC3624PWR Technical Support IntraCore IC3624PWRTable of Contents Page Page Page Connectivity FeaturesIntroduction Management Network Management OptionsPorts PerformanceNetwork Planning Management Access OverviewManagement Method Advantages Disadvantages Snmp AccessSnmp Protocol ProtocolsSafety Recommendations Hardware Installation and SetupInstallation Overview Cooling and Airflow PowerSite Requirements Environmental RequirementsUnpacking and Inspecting Preparing for InstallationRecommended Tools Installing the SwitchMounting the Switch in a Rack Desktop or Shelf Mounting Applying PowerEthernet Cabling Connecting to the Console PortSwitch’s 9-Pin Serial Port Null Modem PC’s 9-Pin DTE Port Wiring Map for Serial CableCable Guidelines Connecting Network DevicesConnecting to PCs, Servers, Hubs and Switches Twisted-Pair DevicesInterpreting LEDs Network Wiring ConnectionsCombo Ports Connectivity GuidelinesFast Ethernet Ports Cable Labeling and Connection Records Connecting to the Switch Configuring the SwitchDirect Access Page Initial Logon Connection SettingsPage General Information Menu Using the InterfaceIntraCore IC3624PWR Layer 2 PoE Switch with Dual Gigabit Hardware Information Basic Configuration MenuAdministration Information Heading DescriptionAdministration Configuration Map Main Menu-Basic Configuration Menu-SNMP Configuration IP ConfigurationSnmp Configuration Map Main Menu-Basic Configuration Menu-IP ConfigurationPage Snmp Management Configuration Trap Configuration Port Link Down Trap Map Main Menu-Basic Configuration Menu-System Security Port ConfigurationForwarding DB Map Main Menu-Basic Configuration Menu-Forwarding DBSntp Configuration ARP Table Map Main Menu-Basic Configuration Menu-SNTP ConfigurationMap Main Menu-Advanced Switch Configuration Advanced Switch ConfigurationMap Main Menu-Basic Configuration- ARP Table Vlan Management Map Main Menu-Advanced Switch Configuration-VLAN ManagementVlan Table Configuration Map Main Menu-Advanced Switch Configuration-VLAN Management Vlan Port Configuration Link Aggregation Map Main Menu-Advanced Switch Configuration-Link AggregationSet Port Priority Port Monitoring Mstp ConfigurationMap Main Menu-Advanced Switch Configuration-Port Monitoring Page Commands Rapid Spanning Tree Cist ConfigurationCist Basic Port Configuration Advanced Cist Port Configuration IntraCore IC3624PWR Layer 2 PoE Switch with Dual Gigabit Designated Topology Information Regional Topology Information Classifier Access List ConfigurationClassifier Configuration Menu Dscp Profile Action Classifier GroupNo Match Action Out Profile Action Port List Mapping Method Quality of Service ConfigurationPolicy Scheduling Method Map Main Menu-Advanced Switch Configuration-Storm ControlStorm Control NAS ID 8 802.1 Port Based Access ControlIgmp Snooping Map Main Menu-Advanced Switch Configuration-IGMP SnoopingShow Igmp Snooping Vlan Filter Table Show Router Port Table Power over EthernetPoE Port Configuration PoE Global Configuration Map Main Menu-Statistics StatisticsMap Main Menu-Tools Tftp Software UpgradeMap Main Menu-Tools-TFTP Software Upgrade ToolsMap Main Menu-Tools-Configuration File Upload/Download Configuration File Upload/DownloadPing Execution System RebootMap Main Menu-Tools-System Reboot Reboot TypeMap Main Menu-Tools-System System LogRun CLI Save ConfigurationMap Main Menu-Tools-Save Configuration to Flash Installation Appendix a Basic TroubleshootingDiagnosing Switch Indicators Power and Cooling ProblemsIntraCore IC3624PWR Layer 2 PoE Switch with Dual Gigabit Performance Appendix B SpecificationsPhysical Characteristics Compliances L2+ SwitchingManagement Features StandardsPin Assignments for 10BaseT/100BaseTX Appendix C Cables and Pin AssignmentsTwisted-Pair Cable and Pin Assignments Pin Assignments for 1000BaseT Pin Straight-Through WiringCrossover Wiring Fiber Standards Cable Testing for Existing Category 5 CableAdjusting Existing Category 5 Cabling to Run 1000BaseT Page FCC Compliance Statement Important Safety Instructions Appendix D FCC Compliance and Warranty StatementsIntraCore Warranty Statement Appendix E. Online Warranty Registration