AT&T 76450 manual Appendix C References, Document Number Document Description

Page 30

Common Systems Connection Standards

AT&T Services, Inc

Date: August 31, 2007

ATT-TP-76450, Issue 9

10 APPENDIX C - References

ATT TP documents may be obtained on the AT&T Technical Publication and Nebs Web site.

Telcordia documents may be obtained directly from Telcordia Technologies Inc.

Document Number

Document Description

 

ATT-TP-76200

Network Equipment – Building Systems

Current

ATT-TP-76300

Installation Guide within the Central Office

Current

ATT-TP-76305

Cable Installation & Removal

Current

ATT-TP-76305-001

SNFA Cable Installation & Removal

Current

ATT-TP-76305-002

48V DC Power Single Line Diagrams

Current

ATT-TP-76306

Firestopping (non-workmanship & processes)

Current

ATT-TP-76400

Detail Engineer Requirements for the C.O.

Current

ATT-TP-76401

Space Planning

Current

ATT-TP-76401-001

Floor Loading Considerations

Current

ATT-TP-76406

Distributing Frames

Pending

ATT-TP-76407

Equipment Framework

Current

ATT-TP-76408

Equipment Superstructure

Current

ATT-TP-76410

Raised Floors

Current

ATT-TP-76412

Telco Electrical and Optical Ethernet Standards

Current

ATT-TP-76413

Connecting Block Standards (89-MDF type)

Current

ATT-TP-76414

Connecting Block Standards (COSMIC 78-112

Pending

 

type)

 

ATT-TP-76415

Connecting Block Standards for Protectors

Pending

ATT-TP-76416

Bonding & Grounding

Current

ATT-TP-76419

High-Twist Distributing Frame Wire Standards

Current

ATT-TP-76430

Synchronization Standards

Current

ATT-TP-76450

Common Systems Standards

Current

ATT-TP-76460

Fiber optic Protection in the Central Office

Pending

ATT-TP-76461

Fiber optic Connector Cleaning

Current

GR-137-CORE

Telcordia-Generic Requirements for Central

Current

 

Office Cable

 

GR-518-CORE

Telcordia – Generic Switch Synchronization

Current

GR-253-CORE

Telcordia – SONET Synchronization for the

Current

 

Network

 

GR-436-CORE

Telcordia – Digital Synchronization Plan

Current

GR-454-CORE

Telcordia Supplier-Provided Documentation

Current

GR-1209-CORE

Telcordia –Fiber optic Branching Components

Current

GR-449-CORE

Telcordia –Fiber Distributing Frames

Current

FR-439

Telcordia – Operations Technology Generic

Current

 

Requirements (OTGR)

 

TR-EOP-000001

Telcordia – Lightning, Radio Frequency, and 60-

Current

 

Hz Disturbances at the BOC Network Interface

 

GR-833-CORE

Telcordia – NE and Transport Surveillance

Current

 

Messages

 

TR-NWT-000930

Telcordia – Hybrid Microcircuits Used in

Current

 

Telecommunications Equipment

 

GR-2419-CORE

Telcordia – Human Factors Requirements for

Current

 

Equipment to Improve Network Integrity

 

Copyright ©2004 – 2006, AT&T Knowledge Ventures

All rights reserved

Page 30

Image 30
Contents Canceled/Superseded Doc N/A Scope RequirementsPurpose Pre-assembled versus Field Assembled Network EquipmentATT-TP-76450 Internet Web Site Product Evaluation Process Additional AT&T RequirementsReasons for Reissue Adherence to AT&T Standard SuppliersPower Feeds AC Powered EquipmentRedundant Power Feeds Nominal -48v DCList 1 Drain Battery Return ConductorDrain Definitions List 1X DrainLocation of Power Terminations 1 16 AWG Stranded Power Cable and LargerTwo Hole Connections 3 18 AWG Power Cable and Smaller Visual Power Alarms and Status IndicatorSize conductor Acceptable termination Associated Listings Fusing of Capacitors Power Distribution DeliveryNE Integrated Power Distribution Direct Bdfb Power DeliveryIndividually Mounted PDU Standards Clock output lead cabling Synchronization/Timing StandardsTermination of timing leads Redundancy of timing inputsAlarms Output card exhaustionTL1 / TCP-IP TBOS/TABS Fiber Fiber AttenuatorsSee Figure Copper DS1 Cross-Connect Wire Central Office Copper Wire and Cable Protection of Cable and Jumpers Vendor DocumentationUnusual Cable Types Softcopy DocumentationCraft Interface Instructions Alarm/Trouble Shooting GuideHard Copy Documentation Personnel Injury and Equipment Damage WarningsRevision Numbering Consistent Terminology throughout DocumentationConsistent Terminology between Documentation and Platform Revision HistoryEquipment lighting Other interconnection requirementsList of Documentation Test Streaker CardsAppendix a ATT-TP-76450 Checklist Instructions and Process InstructionsProcess Page Power Interconnection Standards Alarm Standards Vendor Documentation Part & N/A Footnotes Rqmt# CommentAppendix C References Document Number Document DescriptionAppendix D ATT Contact List Appendix E Acronyms