Common Systems Connection Standards

AT&T Services, Inc

Date: August 31, 2007

ATT-TP-76450, Issue 9

Documentation must be provided in both PDF and HTML format on a CD that is fully indexed and fully searchable.

7.2Hard Copy Documentation

Documentation must be furnished in paper copy on request.

7.3Craft Interface Instructions

Documents must provide step by step instructions for each procedure using Craft GUI, EMS GUI, and TL1 (preferred) or equivalent commands.

Note: Items 7.4 and 7.5 Extend the testing procedure in GR-2914-CORE 20.8 Test Method for Documentation Comprehension to include the complete “Installation Guide

7.4Installation Guide: installation, provisioning, and testing of the network element

Vendor must test and validate that a new user can successfully install, provision, and test the network element by following the “Installation Guide”.

7.5Installation Guide: Creation, provisioning, and testing of a multi-node ring or system

Vendor must test and validate that a new user can successfully create, provision, and test a multi-node ring or system by following the “Installation Guide”.

7.6Alarm/Trouble Shooting Guide

Vendor must test and validate that a new user can use the Alarm or Trouble Shooting guide to successfully identify and clear alarms

7.7Personnel Injury and Equipment Damage Warnings

Documentation must keep the user aware of personnel injury and equipment damage by using the appropriate warnings, dangers, or cautions preceding procedures and incorporating the appropriate steps within the procedures.

7.8Reference Guide

Documentation must include a “Reference” guide that describes each component of the NE in detail

Example: Photographs or detailed drawings of the faceplates of each plug-in with a description of the LEDs in a normal state and in an alarm or other informational state, optical connection type, if applicable, power requirements , etc

Copyright ©2004 – 2006, AT&T Knowledge Ventures

All rights reserved

Page 22

Image 22
Contents Canceled/Superseded Doc N/A Scope RequirementsPurpose Pre-assembled versus Field Assembled Network EquipmentATT-TP-76450 Internet Web Site Product Evaluation Process Additional AT&T RequirementsReasons for Reissue Adherence to AT&T Standard SuppliersPower Feeds AC Powered EquipmentRedundant Power Feeds Nominal -48v DCList 1 Drain Battery Return ConductorDrain Definitions List 1X Drain1 16 AWG Stranded Power Cable and Larger Location of Power TerminationsTwo Hole Connections Visual Power Alarms and Status Indicator 3 18 AWG Power Cable and SmallerSize conductor Acceptable termination Associated Listings Fusing of Capacitors Power Distribution DeliveryDirect Bdfb Power Delivery NE Integrated Power DistributionIndividually Mounted PDU Standards Clock output lead cabling Synchronization/Timing StandardsTermination of timing leads Redundancy of timing inputsAlarms Output card exhaustionTL1 / TCP-IP TBOS/TABS Fiber Fiber AttenuatorsSee Figure Copper DS1 Cross-Connect Wire Central Office Copper Wire and Cable Protection of Cable and Jumpers Vendor DocumentationUnusual Cable Types Softcopy DocumentationCraft Interface Instructions Alarm/Trouble Shooting GuideHard Copy Documentation Personnel Injury and Equipment Damage WarningsRevision Numbering Consistent Terminology throughout DocumentationConsistent Terminology between Documentation and Platform Revision HistoryEquipment lighting Other interconnection requirementsList of Documentation Test Streaker CardsInstructions Appendix a ATT-TP-76450 Checklist Instructions and ProcessProcess Page Power Interconnection Standards Alarm Standards Vendor Documentation Part & N/A Footnotes Rqmt# CommentAppendix C References Document Number Document DescriptionAppendix D ATT Contact List Appendix E Acronyms