AT&T 76450 manual Appendix D ATT Contact List, Appendix E Acronyms

Page 31

Common Systems Connection Standards

AT&T Services, Inc

Date: August 31, 2007

ATT-TP-76450, Issue 9

11 Appendix D - ATT Contact List

Wing Eng, Area Manager-Common Systems Standards, DSX, Copper Cable Standards

(925)823-4616,E-Mail:we2583@camail.att.com

Doug Florence, Area Manager- Common Systems Standards, New Product Integration

(925)867-9951,E-Mail:df1538@camail.att.com

Ed Granger, Area Manager- Common Systems Standards Power Pro Support

(203)553-8189,E-Mail:eg1724@ctmail.att.com

Jeffrey Langley, Area Manager- Common Systems Standards, Alarm Standards

(816)275-5140,E-Mail:jl8501@momail.att.com

Dave Overdorf, Area Manager- Common Systems Standards, Synchronization Standards (404)927-9603, E-Mail: do3863@att.com

John Tablerion, Area Manager- Common Systems Standards, ATT-TP-76200 (NEBS) (708) 403-4450, E-Mail: jt3216@att.com

Mike Yeilding, Area Manager- Common Systems Standards, Common Systems Drawings

(925)823-4747,E-Mail:my1515@camail.att.com

12Appendix E – Acronyms

a)The term product supplier as used throughout this section refers to the equipment manufacturer or agent of the equipment manufacturer, whichever is appropriate for the product being considered.

b)Requirements are those product features that must be provided by the equipment manufacturer. The words “shall” and “must” are used throughout this section to identify requirements.

c)Objectives are product features that are desired for the long term use or application. The word “should” is used throughout this section to identify objectives.

d)NE- Network Equipment or Network Element package provided by the Manufacturer for consideration.

e)OEM – Original Equipment Manufacturer

f)OSMINE – Operations Systems Modifications for Integration of Network Elements

g)PDM – Product Manager

h)PDU – Power Distribution Unit

i)RMU – Rack Mounting Unit

j)TIRKS – Trunk Integrated Records Keeping System

k)SME- Subject Matter Expert

Copyright ©2004 – 2006, AT&T Knowledge Ventures

All rights reserved

Page 31

Image 31
Contents Canceled/Superseded Doc N/A Pre-assembled versus Field Assembled Network Equipment RequirementsPurpose ScopeAdditional AT&T Requirements ATT-TP-76450 Internet Web Site Product Evaluation ProcessAdherence to AT&T Standard Suppliers Reasons for ReissueNominal -48v DC AC Powered EquipmentRedundant Power Feeds Power FeedsList 1X Drain Battery Return ConductorDrain Definitions List 1 Drain1 16 AWG Stranded Power Cable and Larger Location of Power TerminationsTwo Hole Connections Visual Power Alarms and Status Indicator 3 18 AWG Power Cable and SmallerSize conductor Acceptable termination Associated Listings Power Distribution Delivery Fusing of CapacitorsDirect Bdfb Power Delivery NE Integrated Power DistributionIndividually Mounted PDU Standards Redundancy of timing inputs Synchronization/Timing StandardsTermination of timing leads Clock output lead cablingOutput card exhaustion AlarmsTL1 / TCP-IP TBOS/TABS Fiber Attenuators FiberSee Figure Copper DS1 Cross-Connect Wire Central Office Copper Wire and Cable Softcopy Documentation Vendor DocumentationUnusual Cable Types Protection of Cable and JumpersPersonnel Injury and Equipment Damage Warnings Alarm/Trouble Shooting GuideHard Copy Documentation Craft Interface InstructionsRevision History Consistent Terminology throughout DocumentationConsistent Terminology between Documentation and Platform Revision NumberingTest Streaker Cards Other interconnection requirementsList of Documentation Equipment lightingInstructions Appendix a ATT-TP-76450 Checklist Instructions and ProcessProcess Page Power Interconnection Standards Alarm Standards Part & N/A Footnotes Rqmt# Comment Vendor DocumentationDocument Number Document Description Appendix C ReferencesAppendix E Acronyms Appendix D ATT Contact List