Common Systems Connection Standards | AT&T Services, Inc |
Date: August 31, 2007 |
Note: The expectation is that a
7.13.2List of Documentation
Forward a list of all documentation that will be provided to AT&T for the planned deployment of the equipment (e.g., full document number, title and revision number for planning, installation, operations, etc.) and instructions on how AT&T can access these documents at this time (e.g., Public Website, Restricted client portal.)
.
7.13.3Provide a list sites where AT&T can gain access to the above documents today. (i.e. Public Website, Restricted client portal.)
8 Other interconnection requirements
8.1Equipment lighting
If NE includes integrated lighting system, the system shall meet the lighting and illumination requirements in
8.2Test (Streaker) Cards
Network Transport Elements shall have test cards (e.g., streaker) to enable verification of the network element hardware and the continuity of cabling, through the backplane, to the point of termination such as DSX panels or frames.
The test card or cards shall not:
•require the shelf to be powered for such testing.
•interrupt existing service on any other slot.
The test card or cards shall:
•Provide metallic access to each backplane terminating conductor via an appropriate connector Bantam for DS1, including timing inputs, 440 for
•Facilitate optical signal insertion and transmission for continuity checking of optical jumpers that would, when such active
Note: Test Set connections on face of
Copyright ©2004 – 2006, AT&T Knowledge Ventures
All rights reserved