Verizon Network Manager Nodes manual Implementation Details

Page 26

Implementation Details

Figure 7-2: Implementation Details

4.Select Activate Trigger Points in the Trigger Point section to activate trigger points when the plan is implemented. This option is only available if Trigger Points are in the plan.

5.De-select the As soon as possible option and select the date and time you want from the Effective Date and Time field if you want the plan to implement in the future.

6.Select the Rollback option and date and time for the rollback from the Rollback Date and Time section if you want to return to the current “plan in use.”

7.Click Submit. The Results of the IMPL request dialog appears (next page).

7-2

Version 1.08

January 15, 2008

Image 26
Contents Version Page Table of Contents View and Maintain Orders Access HelpCopy Classic to Nodes Obtain Customer SupportNetworx Universal Customer Center Overview System RequirementsVersion January 15 Features and Benefits Product Overview Network Manager OverviewVersion January 15 Review the Network Control System Network Control System Node Analyze Nodes-Based RoutingNodes-Based Routing Model ReusableValue-Based Node Analyze Node-Based Routing, cont’dLabel Routing Node Types Routing Node TypesVersion January 15 Identify Details in the Navigation Tree SearchNavigation Tree Node Details ExpandPlan Level Navigation Tree Node Details, cont’dCorporation Details Plan Details Set DetailsNumber Details Routing Plan Maintenance View and Print a PlanView Plan Details Plan DetailsView the Details of a Parent or Child Node Model DetailsView Termination Details Termination DetailsView Termination Details, cont’d Termination DetailsView a Structure Implement a Plan Implementation Details Implementation DetailsImplement Order Results For Your InformationVersion January 15 Perform Quick Percent Allocations and Termination Changes Perform a QuickRouting Plan Maintenance Quick Change Change the Percent AllocationSet a Rollback Date and Time Submit Percent Allocation ChangeReplace a Termination Quick ChangeTermination Selection Quick LTerm SelectAdd a Termination Quick Add a Termination, cont’d Delete a Termination or Treatment Quick Redefine a DAL Termination Quick Change Redefine a DAL TerminationRedefine a DAL Termination, cont’d DAL Termination Node Redefine a DTRLimited Quick 10 Quick ChangeLimited Quick, cont’d 11 Submit Quick with Pending OrderPerform a Quick from the Integrated Call Tree ICT 12 HomePerform a Quick from the ICT, cont’d 13 ICTSubmit an ICT Quick Order 14 Quick OrdersVersion January 15 View Plan History and Compare View the Order History for a PlanShow History Order ListOrder Differences Order Differences Toolbar Plan Compare Show DifferencesClick Close to return to the Home Copy Classic to Nodes Classic to Nodes CopyCopy Classic to Nodes, cont’d Copy Plan to NodesClassic to Nodes Routing Plan Plan Level Info Update Change Your Main PlanDelete a Classic Plan Delete a Classic Plan10-6 Version January 15 View and Maintain Orders Use the Order Filter Order FilterSet Column Preferences Column PreferencesView the Order List First half of Order ListInterpret the Order List First Half of Order ListView the Details of an Order Order ManagerEdit an Order Click Unapprove to unapprove an orderView the Order Calendar Order CalendarAccess Help Help12-2 Version January 15 Obtain Customer Support Select Help & Contact Contact Us13-2 Version January 15 Index