Verizon Network Manager Nodes manual Copy Classic to Nodes, Classic to Nodes Copy

Page 51
SECTION
10

Copy Classic to Nodes

You can copy an advanced classic plan to create a new nodes-based plan for a Number Level Plan (NLP), a Super Routing Plan (SRP), or an Enhanced Voice Services (EVS) plan.

Converting a plan to nodes increases your routing capability on the given plan. It is important that you attend the Nodes training to understand the

new routing capabilities before copying. You can implement the nodes plan to change your numbers from classic to nodes once the copy order is approved. You can also delete your classic plans when you no longer need them.

Figure 10-1: Classic to Nodes Copy

1.Expand a number within a Corp/NLP/Set for which you want to copy an Advanced Classic plan to a Nodes plan.

2.Select a classic plan.

January 15, 2008

Version 1.08

10-1

Image 51
Contents Version Page Table of Contents Obtain Customer Support Access HelpCopy Classic to Nodes View and Maintain OrdersSystem Requirements Networx Universal Customer Center OverviewVersion January 15 Product Overview Network Manager Overview Features and BenefitsVersion January 15 Review the Network Control System Network Control System Model Reusable Analyze Nodes-Based RoutingNodes-Based Routing NodeAnalyze Node-Based Routing, cont’d LabelValue-Based Node Routing Node Types Routing Node TypesVersion January 15 Search Identify Details in the Navigation TreeExpand Navigation Tree Node DetailsNavigation Tree Node Details, cont’d Corporation DetailsPlan Level Set Details Number DetailsPlan Details View and Print a Plan Routing Plan MaintenancePlan Details View Plan DetailsModel Details View the Details of a Parent or Child NodeTermination Details View Termination DetailsTermination Details View Termination Details, cont’dView a Structure Implement a Plan Implementation Details Implementation DetailsFor Your Information Implement Order ResultsVersion January 15 Perform a Quick Perform Quick Percent Allocations and Termination ChangesChange the Percent Allocation Routing Plan Maintenance Quick ChangeSubmit Percent Allocation Change Set a Rollback Date and TimeQuick Change Replace a TerminationLTerm Select Termination Selection QuickAdd a Termination Quick Add a Termination, cont’d Delete a Termination or Treatment Quick Quick Change Redefine a DAL Termination Redefine a DAL TerminationDAL Termination Node Redefine a DTR Redefine a DAL Termination, cont’d10 Quick Change Limited Quick11 Submit Quick with Pending Order Limited Quick, cont’d12 Home Perform a Quick from the Integrated Call Tree ICT13 ICT Perform a Quick from the ICT, cont’d14 Quick Orders Submit an ICT Quick OrderVersion January 15 View the Order History for a Plan View Plan History and CompareOrder List Show HistoryOrder Differences Order Differences Toolbar Show Differences Plan CompareClick Close to return to the Home Classic to Nodes Copy Copy Classic to NodesCopy Plan to Nodes Copy Classic to Nodes, cont’dClassic to Nodes Routing Plan Change Your Main Plan Plan Level Info UpdateDelete a Classic Plan Delete a Classic Plan10-6 Version January 15 View and Maintain Orders Order Filter Use the Order FilterColumn Preferences Set Column PreferencesFirst half of Order List View the Order ListFirst Half of Order List Interpret the Order ListOrder Manager View the Details of an OrderClick Unapprove to unapprove an order Edit an OrderOrder Calendar View the Order CalendarHelp Access Help12-2 Version January 15 Select Help & Contact Contact Us Obtain Customer Support13-2 Version January 15 Index