Verizon Network Manager Nodes manual Delete a Termination or Treatment Quick

Page 36

Delete a Termination or Treatment (Quick)

1.Select a toll-free number from the navigation tree on the Home page.

2.Click the Quick icon on the toolbar. The Routing Plan Maintenance dialog appears.

3.Double-click the lightning bolt on the branch where you want to change the termination. The Quick Change dialog appears.

Figure 8-7: Quick Change

4.Select the termination, a DAL termination, or treatment.

5.Click Delete.

6.Adjust the percentage for the remaining terminations until the total is 100.

7.Click Close. The Routing Plan Maintenance dialog reappears.

8.Click the Approve icon on the toolbar.

9.Click Continue to permanently save and complete the termination(s) changes.

-OR-

Check the Rollback Order option to go back to the original percent allocation and termination(s) at a later date.

Select a date and time from the Select rollback date drop-down lists.

8-8

Version 1.08

January 15, 2008

Image 36
Contents Version Page Table of Contents Access Help Copy Classic to NodesView and Maintain Orders Obtain Customer SupportNetworx Universal Customer Center Overview System RequirementsVersion January 15 Features and Benefits Product Overview Network Manager OverviewVersion January 15 Review the Network Control System Network Control System Analyze Nodes-Based Routing Nodes-Based RoutingNode Model ReusableAnalyze Node-Based Routing, cont’d LabelValue-Based Node Routing Node Types Routing Node TypesVersion January 15 Identify Details in the Navigation Tree SearchNavigation Tree Node Details ExpandNavigation Tree Node Details, cont’d Corporation DetailsPlan Level Set Details Number DetailsPlan Details Routing Plan Maintenance View and Print a PlanView Plan Details Plan DetailsView the Details of a Parent or Child Node Model DetailsView Termination Details Termination DetailsView Termination Details, cont’d Termination DetailsView a Structure Implement a Plan Implementation Details Implementation DetailsImplement Order Results For Your InformationVersion January 15 Perform Quick Percent Allocations and Termination Changes Perform a QuickRouting Plan Maintenance Quick Change Change the Percent AllocationSet a Rollback Date and Time Submit Percent Allocation ChangeReplace a Termination Quick ChangeTermination Selection Quick LTerm SelectAdd a Termination Quick Add a Termination, cont’d Delete a Termination or Treatment Quick Redefine a DAL Termination Quick Change Redefine a DAL TerminationRedefine a DAL Termination, cont’d DAL Termination Node Redefine a DTRLimited Quick 10 Quick ChangeLimited Quick, cont’d 11 Submit Quick with Pending OrderPerform a Quick from the Integrated Call Tree ICT 12 HomePerform a Quick from the ICT, cont’d 13 ICTSubmit an ICT Quick Order 14 Quick OrdersVersion January 15 View Plan History and Compare View the Order History for a PlanShow History Order ListOrder Differences Order Differences Toolbar Plan Compare Show DifferencesClick Close to return to the Home Copy Classic to Nodes Classic to Nodes CopyCopy Classic to Nodes, cont’d Copy Plan to NodesClassic to Nodes Routing Plan Plan Level Info Update Change Your Main PlanDelete a Classic Plan Delete a Classic Plan10-6 Version January 15 View and Maintain Orders Use the Order Filter Order FilterSet Column Preferences Column PreferencesView the Order List First half of Order ListInterpret the Order List First Half of Order ListView the Details of an Order Order ManagerEdit an Order Click Unapprove to unapprove an orderView the Order Calendar Order CalendarAccess Help Help12-2 Version January 15 Obtain Customer Support Select Help & Contact Contact Us13-2 Version January 15 Index