ABC Office 4109 CC, 4107 CC manual Installation, Pre-assembly

Page 5

2. Installation

The machine is mobile on castors. The machine must be installed on a sturdy, dry, and level floor. Oil level must be visible in the sight glass (2)

IDEAL 4109 version.

Danger!

-The machine may not be installed outside.

-Do not use in the vicinity of flammable liquids or gases.

-Do not use in humid environments.

-Protect the power cable from extreme heat, oil, and sharp edges.

-Consider the floor loading. Weight with press approx. 900 kg (1990 pounds).

Warning!

- Do not cover the ventilation slits (3).

2.1 Pre-assembly

- Fix the side tables (4) and (5) to the machine.

5

Image 5
Contents Ideal 4107 CC Ideal 4107 Ideal Table of contents Application Safety InstructionsGeneral Pre-assembly InstallationChecking rotating direction Power supplyStarting the machine OperationOperating elements Ideal Switching off the machine Replacing the plastic bag Ideal Oiling the shredding mechanismOperation of baler Ideal Page Ideal 4107 Ideal Page Central lubrication Ideal Premature ejecting of bale IdealTrouble-shooting Technical data AccessoriesEG-KONFORMITÄTSERKLÄRUNG