Studer Innotec SI SERIES Option SI performance 3-phased, Working, Connecting, Commissioning

Page 9
Option SI performance 3-phased

STUDER INNOTEC

SI

Option SI performance 3-phased

Three SI inverters can be connected together to build a 3-phased grid. They have to be equipped with the PE option.

Working

Two ways of working are possible with the SI performance :

1) Working alone

One SI inverter can be used alone. The inverter works then as a single one, like it is described in this manual.

2) Working in a grid

Thanks to the connecting cable, three inverters can be connected together in order to obtain a 3*400V 3-phased grid.

Connecting

1)Check that the inverters are in OFF position.

2)First link together the neutral of all 3 devices by taking care that this connecting point be not further than 1 m from each inverter.

3)Link together the battery cables (take care to not reverse the polarity). The 3 inverters have to be connected together to only one battery bank.

Commissioning

At the time of commissioning it is necessary to operate all the 3 inverters. The inverters work independently from each other and can be loaded in an asymmetrical way. They can work either in stand-by mode or in ON mode (see working description in this manual.

User manual

SI V3.0 E

9

Image 9
Contents STUDER INNOTEC STUDER INNOTECUsers and Installers Handbook SI SERIESAdjustment procedure WIRING DIAGRAM FOR SI 600 - 800 S SOLAR CHARGE REGULATORRed Fault - LED DESCRIPTION AND WIRING DIAGRAMIntroduction After disconnecting the battery, the outputApplications and Performance Product presentationRemote control AssemblyCheck the tension and polarity of the battery ConnectionAdjustments SafetyIndicators Adjustment procedureAlarm contact MaintenanceOptions LegislationDescription and wiring diagram Wiring diagram for SI 600 - 800 S Solar charge regulator Connecting Option SI performance 3-phasedWorking Commissioning1212 STUDER INNOTECSI1624 2324