Hardware requirements 29
Table 3
Chassis shipping accessories: Ethernet Routing Switch 8310 and 8306 chassis
Check
Accessory
Use to
Bracket kit containing the | Prepare the chassis for installation |
following: | in an equipment rack. |
• two rack mounting brackets |
|
• bracket- mounting machine |
|
screws, each being 0.164 |
|
inches wide, 32 threads to |
|
the inch and 0.250 inches |
|
long |
|
— The 8310 chassis ships |
|
with 24 of these screws. |
|
— The 8306 chassis ships |
|
with 14 of these screws. |
|
|
|
Screw package containing | Mount the chassis in an equipment |
wafer head screws each being | rack. |
0.190 inches wide, 32 threads |
|
to the inch and 0.75 inches long |
|
with flat nylon washers: |
|
•The 8310 chassis ships with 14 of each.
•The 8306 chassis ships with 10 of each.
2 side cable management | Manage network interface cables. |
brackets |
|
|
|
Rubber footpads | Keep the chassis from slipping |
| when mounting it on a flat surface. |
|
|
Console cable | Connect an optional management |
| console to the chassis. |
The following figures illustrate the items included in the chassis shipping container.
Nortel Ethernet Routing Switch 8300
Installation — Chassis
16 June 2008
Copyright © 2008 Nortel Networks