40Ethernet Routing Switch 8310 and 8306 chassis installation
Procedure job aid: Maximum number of chassis installed in
The following table shows the maximum number of chassis that you can install in a
Chassis | Maximum number of chassis installed in |
|
|
8310 | 3 |
|
|
8306 | 4 |
|
|
Installing the cable guides
Install the cable guides to keep cable clusters fastened and out of the way, but still accessible for maintenance.
Nortel Ethernet Routing Switch 8300
Installation — Chassis
16 June 2008
Copyright © 2008 Nortel Networks