Nortel Networks 8310, 8306 manual Installing the cable guides

Page 40

40Ethernet Routing Switch 8310 and 8306 chassis installation

--End--

Procedure job aid: Maximum number of chassis installed in 7-foot rack

The following table shows the maximum number of chassis that you can install in a 7-foot rack.

Chassis

Maximum number of chassis installed in 7-foot rack

 

 

8310

3

 

 

8306

4

 

 

Installing the cable guides

Install the cable guides to keep cable clusters fastened and out of the way, but still accessible for maintenance.

Nortel Ethernet Routing Switch 8300

Installation — Chassis

NN46200-309 01.01 Standard

16 June 2008

Copyright © 2008 Nortel Networks

Image 40
Contents Installation Chassis Legal Notice Contents Switch operations International Regulatory Statements of Conformity Regulatory Information and Safety PrecautionsFCC Statement USA only Ices Statement Canada only CE Marking Statement Europe onlyVcci Statement Japan/Nippon only Bsmi Statement for 8310, and 8306 Chassis Taiwan onlyNOM Statement 8310 and 8306 Chassis Mexico only National Safety Statements of ComplianceCE Marking Statement Europe only EN 60 950 Statement Información NOM unicamente para México Información NOM unicamente para MéxicoDenan Statement Japan/Nippon only Safety Messages ESD Achtung Warnung Perigo Software license Nortel Networks Inc. software license agreementGeneral Nortel Networks Inc. software license agreement Software license New in this release FeaturesOther changes New in this release Prerequisites IntroductionNavigation Introduction Chassis installation fundamentals Ethernet Routing Switch 8310 chassisRisk of equipment damage Ethernet Routing Switch 8306 chassis Power supplies Site requirements Fan traysSpace requirements Shipment contents AC input electrical requirementsHardware requirements Chassis installation fundamentals Other equipment Management consoleCables Successful installation verificationMounting hardware for the 8310, 8306 chassis Ethernet Routing Switch 8310 and 8306 chassis installation Chassis installation proceduresEthernet Routing Switch 8310 and 8306 chassis installation Chassis installation time requirements Reducing the chassis weightInstalling the chassis on a flat surface Procedure stepsProcedure job aid Chassis weight including components PrerequisitesPrerequisites Ethernet Routing Switch 8310 and 8306 chassis installation Chassis Rack units Inches Installing the cable guides Installing the cable guides Ethernet Routing Switch 8310 and 8306 chassis installation Switch operations Powering on DC power suppliesPowering on AC power supplies Switch operationsResetting the switch Installing removable flash memory cards ActionRemoving removable flash memory cards Protecting memory card files Reinsert the memory card into the card receptacle Switch operations Part Numbers Part Numbers Protecting memory card files Part Numbers Physical specifications Ethernet Routing Switch 8310 chassis specificationsTechnical specifications International regulatory requirements Ethernet Routing Switch 8306 chassis specifications International regulatory requirements Ethernet Routing Switch 8301 AC power supply specifications Ethernet Routing Switch 8302 AC power supply specifications Ethernet Routing Switch 8005DC power supply specifications Parameter SpecificationsEthernet Routing Switch 8005DI DC power supply specifications Translations of safety messages Class a device caution statementElectrostatic discharge caution statement Attenzione ESD Translations of safety messages Page Installation Chassis