American Power Conversion LVD400, LVD500, LVD600 manual Manual Handling, Preparation, Method

Page 16

SECTION 8: MANUAL HANDLING

GENERAL

1This unit (weight 15 kg) presents a hazard.

2The Manual Handling of Loads Regulations, 1993 require that all persons working on the equipment are familiar with the Regulations, that they take care to minimise risk of injury to themselves and others, that they are properly trained, and that the correct equipment is used. Safety shoes are to be worn.

3If in doubt about methods, ability to handle the loads, training or equipment, do not proceed without first seeking advice from a Competent Person.

PREPARATION

4Before commencing work, the following must be checked:

4.1The floor must be level, clean, firm and dry.

4.2The working area must be clear of obstacles which could obstruct movement or cause tripping.

4.3There must be adequate room for the operator(s), equipment and load.

4.4Lighting must be sufficient for the load, equipment, loading surfaces, potential hazards and working environment to be seen clearly.

4.5Sound levels must not be high enough to cause distraction.

METHOD

5The following comments are not intended to replace other documents and training courses; only to serve as a guide and check-list. For full guidance, refer to the Regulations and supporting documents.

5.1Before lifting loads, stand as close as possible to the load.

5.2Keep the back straight and as vertical as possible.

5.3Use the leg muscles to lift in preference to the arms.

5.4Minimise twisting, stretching and stooping.

5.5Loads should be withdrawn/inserted evenly, without jerking, maintaining the load level and balanced with adequate support.

Page 16 of 20

Text artwork 990-9030 Rev. A. Equipment Handbook for the Low Voltage Disconnectors series

Image 16
Contents Equipment Handbook for LOW Voltage Disconnectors Contents Issue Record Issue Description DateSafety Instructions Before using the units, carry out the followingSpecification Circuit Description Keyswitch Controls and IndicatorsLVD PCA LED Voltage Monitor Settings Installation and CommissioningPRE Installation Test Stage 2 Input connections Stage 3 Remote loop connectionsStage 2 Power up sequence CommissioningStage 1 Preparation Stage 3 Output connectionsSIX Monthly Check Routine MaintenanceAnnual Check Fault Diagnosis and Repair Field Replaceable UnitsFuse Removal and Replacement Fuse FailureLVD PCA Failure LVD PCA Removal and ReplacementContactor Failure Contactor Removal and Replacement Preparation Manual HandlingMethod Appendix a Service LOG Date Service LOG Action Actioned by Name SignatureBlank Appendix B System Drawings DrawingRear