APC 990-4053 manual APC Silcon Battery Cabinets, Important Safety Instructions

Page 29

External Connection

4.8APC Silcon Battery Cabinets

IMPORTANT SAFETY INSTRUCTIONS

aThe installation of battery drawers in UPS cabinets requires battery knowledge and should be made or supervised by qualified personnel only. Keep unauthorized personnel away from batteries.

bUse identical battery types and numbers when replacing batteries. See battery supplier manual for further details.

cCAUTION - Do not dispose of batteries in a fire. Battery may explode.

dCAUTION - Batteries are fully charged on delivery. Do not short battery terminals or DC terminals.

eCAUTION - Avoid rough treatment and opening of batteries. Released electrolyte is harmful to skin and eyes and may be toxic.

fCAUTION - Batteries may cause electric shocks and high voltage short-circuit current. Follow below precautions when working with batteries:

1Remove watches, rings and other metal objects.

2Use tools with insulated handles.

3Wear rubber gloves and boots.

4Do not leave tools or metal parts on top of batteries.

5Disconnect charging source prior to connecting batteries.

Installation and use of this product must comply with all national, federal, state, municipal or local codes. If you need assistance, please have your UPS model and serial number ready and call APC, see “How to Contact APC” in this guide.

For more information on the APC World Wide Web site at http://www.appc.com.

WARNING!

The entire system contains HAZARDOUS AC/DC VOLTAGES from several power sources. Some terminals and components are live even with the system being switched off!

ONLY qualified electricians should carry out installations according to national and local codes.

NO UPS types may have built-in batteries when connected to external batteries!

NEVER install batteries not complying with APC specifications. Failing that, the installer takes over full responsibility!

NEVER lift or transport connected or installed batteries.

NOTICE!

For reliability reasons do not stand on the UPS. keep the UPS cabinet surface free of any objects.

990-4053

Installation Guide APC Silcon 480kW 400V UPS

29

Image 29
Contents APC Silcon 480kW 400V UPS Installation Guide Thank You Installation Guide APC Silcon 480kW 400V UPSSafety Symbols used in this manual Contents Warranty System Specifications10.0 How to Contact APC AppendixIntroduction IntroductionTools and Equipment ToolsUnpacking UnpackingInstallation InstallationRequirements on Site Height mm Width mm Depth mm1 1900mm Cabinet for 480kW UPS Footprint2 1600mm Cabinet for 480kW Isolation Transformer FrontExternal Connection Connecting the UPSExternal Connection Right side viewFuses Output480kW 1000 185System Integration Interface Connections Terminal Blocks X003/X004 Anxiliary Contacts Parallel BoardX005 Output Relays Parallel BoardExternal Connection External Control Cables Power CablesRelays Relay BoardRelay Board/Relay Functions Relay Message Alarm-trigging Events NumberSee .2 System configuration Communication Interface Board Connecting of APC Silcon Tripel Chassis APC Silcon Triple Chassis Safety WarningsProduct Description Monitoring PortInstalling Management Peripherals Optional Power InputLEDs If the LED is… Then the Silcon Triple Chassis…Order of Management Peripheral Cards Installing Management Peripheral CardsManagement Priority Position Peripheral Card Daisy-chaining the APC Silcon Triple ChassisManagement Peripheral Draw mA If Problems Persist TroubleshootingProblem Possible Cause Solution Product Specifications Monitoring Port Pin Assignments External Connection Environmental Power, Physical, and Environmental SpecificationsPhysical Important Safety Instructions APC Silcon Battery CabinetsSilcon Installation of BatteriesDiagram UPS with Battery Cabinet Battery Breaker Box/Fuse-box Circuit Current kA Battery Breaker BoxAmpere Connection Max Dimensions Weight Rating Cable Short APC Battery Breaker Box Connection Diagram External Connection Programming Parameters Parameter Setting CommentsProgramming Parameters ParametersProgramming Keys Programming Example Switch to Bypass Operation System ConfigurationSystem Configuration Parameters password protected Programming Example Change Charge Voltage to Change parameters by pressing Programming Parameters for Advanced Parallel Operation Description of SettingsProgramming example Battery MonitorOptions/Accessories Options/AccessoriesService Bypass Panel for Single Operation 480 1000 3x185 3x150 800 M12 1825x 250Options/Accessories Display shows Operating The External Service Bypass SwitchLamp indication On Servive Bypass Panel Switching from External Bypass to Normal UPS OperationService Bypass Panel for Parallel Redundant Operation Two Parallel Systems with Service Bypass Panel Options/Accessories H002a Action Options/Accessories Display shows Lamp indication On Service Bypass PanelAction Following can be carried out on any UPS Isolating One UPS for Service/MaintenanceSwitching Back to Normal Parallel/Redundant Operation Intersystem Synchronization Unit ISU Intersystem Synchronization UnitIntersystem Synchronization Unit System ISU System Standard Short-haul RS232 Modem Async Remote DisplayExtension of Remote Display Communication Distance Host DTE Remote Display DTE Connections Without ConverterConnections With Converter Pin Connections for cable from host to ME800A-R2 HostRemote Display Cables Remote Display Power SupplyRemote Display Setting Communication FaultAlarms Remote Display UseIsolation Transformer Height mm Width mm Depth mm Weight kg 480kW 1800 1600 1950Connecting Isolation Transformer Isolation External External PE Cable mm2 SignalInput Input Cable Output Temp Fuses* FM 185 DIN gL typesOptions/Accessories Options/Accessories Options/Accessories Options/Accessories Options/Accessories System Specifications System SpecificationsTechnical Data Dimensions / WeightAPC Silcon Series Limited Factory Warranty WarrantyWarranty Appendix Installation Planning DataAppendix Appendix How to Contact APC How to Contact APCAPC Corporate APC DenmarkPage