Options/Accessories
H002a
6.2.5 Switching Back to Normal Parallel/Redundant Operation
1.Turn input switch (Q001) and output switch (Q002) to position “1”
2.Charge capacitor, connect battery and start up UPS
UPS will automatically switch to normal operation and start
WARNING!
System will discharge
Installation Guide APC Silcon 480kW 400V UPS | 55 |