Maintenance & Testing
6.0 Maintenance & Testing
UPS maintenance should be carried out by trained service engineers only. Service and maintenance contract is recommended.
6.1Fan
It is recommended to replace fans every 3 years.
6.2Battery Monitoring Test
Systems with
Battery Test Results:
1.Battery OK.
2.Reduced battery capacity - “Battery weak” message appears.
3.Battery capacity too low - “Battery defective” message appears.
Carry out battery monitoring test by discharging max. 25% of battery energy. For systems with no battery monitor/no excess
Carry out battery tests when load is least affected.
6.3Battery Capacity Test
CAUTION!
Allow 16 hours to restore full
User Guide APC Silcon 480kW 400/415V UPS | 29 |