3Com user manual PSE2500-A3 External PoE

Page 29

User Manual

Chapter 4 Installation and

PSE2500-A3 External PoE

Power System

Debugging

2)Verify that the “AC OK”, “DC OK”, and green LED are on and the fan operates on each rectifier.

3)Wait approximately 10-30 seconds to allow the system to go through its start-up procedure.

4)Verify that the green LED on the controller panel is on. All alarm LEDs should be off after all rectifiers are latched in place and all AC circuit breakers are closed.

5)Using a digital voltmeter to verify that the plant voltage is approximately 54V, the default factory setting for the controller.

6)Turn one the AC power input switch off to verify that the red alarm LED lights on the controller.

7)For systems with more than one rectifier installed, turn the second AC input switch off to verify that the FAULT LED lights on the controller. Clear the alarms by turning the AC circuit breaker on.

When the system shipped from the factory, normally all the systems parameters have been configured as the default value. Contact Hangzhou Huawei-3Com Technology Co., Ltd. if special setting is needed.

4-8

Image 29
Contents PSE2500-A3 External PoE Power System Technical Support About This Manual Chapter ContentsConvention Description Convention Description BoldfaceEnvironmental Protection Table of Contents Engineering Maintenance and Troubleshooting Introduction Architecture and ConfigurationsDescription Standard Configuration Description Standard Configuration 2PSE2500-A3 configuration Features3PSE2500-A3 configuration Overview System DescriptionCondition Fault Green Red2Front panel of the rectifier ControllerII. Communicate with deamon systems Monitoring the system operation statusRS485 Pin Definition RS232 Pin DefinitionPin Definition AC Distribution UnitDC Distribution Unit Safety Statements SafetyPSE2500-A3 External PoE Power System Safety Precautions PSE2500-A3 External PoE Power System Safety Introduction Installation and DebuggingSafety Physical Mounting 1Physical installation Installing RectifiersFrame Grounding 2Installing rectifiers3Frame grounding Load ConnectionsInitial Start-up Connecting to AC utility/ AC groundingPowering on the Device PSE2500-A3 External PoE LED Indication Engineering Maintenance TroubleshootingMaintenance and Troubleshooting Possible solution Controller Rectifier Possible Alarm Display Problems StatusDiscipline Standards Regulatory compliance standardsController Rectifier Possible