4.2 Physical Mounting
All items needed for a site are contained within the packing crate. The ordered rectifiers may be shipped separately. Please check the packing list.
1)Place the crate in its vertical position near the installation site.
2)Carefully remove the crate top and sides and then the packing material. If possible, recycle the packing crate and the packing material. If not, dispose of properly.
3)Within the packing crate may be the following items: chassis, rectifiers, and cables. Remove all this material and place aside.
4)Install the chassis into the