Chapter 4 Installation and

PSE2500-A3 External PoE

Power System

Debugging

Note that the PSE2500-A3 is shipped to the customer site mostly pre-assembled so as to minimize the overall installation process. The following installation sequence is recommended

z

z

z

z

z

z

Physical mounting Installing rectifiers Frame grounding Connecting to loads

Connecting to AC utility/AC grounding Initializing the system

4.2 Physical Mounting

All items needed for a site are contained within the packing crate. The ordered rectifiers may be shipped separately. Please check the packing list.

1)Place the crate in its vertical position near the installation site.

2)Carefully remove the crate top and sides and then the packing material. If possible, recycle the packing crate and the packing material. If not, dispose of properly.

3)Within the packing crate may be the following items: chassis, rectifiers, and cables. Remove all this material and place aside.

4)Install the chassis into the 19-inch standard cabinet by using eight pieces of M6 screws. Notes that use the electric screwdriver and correct torque setting (recommend 6.2 to 6.5 N.m). See figure 4-1.

4-3

Image 24
Contents PSE2500-A3 External PoE Power System Technical Support Chapter Contents About This ManualConvention Description Boldface Convention DescriptionEnvironmental Protection Table of Contents Engineering Maintenance and Troubleshooting Architecture and Configurations Description Standard ConfigurationIntroduction Description Standard Configuration Features 2PSE2500-A3 configuration3PSE2500-A3 configuration System Description OverviewFault Green Red ConditionController 2Front panel of the rectifierMonitoring the system operation status II. Communicate with deamon systemsRS232 Pin Definition RS485 Pin DefinitionAC Distribution Unit DC Distribution UnitPin Definition Safety Safety StatementsPSE2500-A3 External PoE Power System Safety Precautions PSE2500-A3 External PoE Power System Safety Installation and Debugging IntroductionSafety Physical Mounting Installing Rectifiers 1Physical installation2Installing rectifiers Frame GroundingLoad Connections 3Frame groundingConnecting to AC utility/ AC grounding Powering on the DeviceInitial Start-up PSE2500-A3 External PoE Engineering Maintenance Troubleshooting Maintenance and TroubleshootingLED Indication Controller Rectifier Possible Alarm Display Problems Status Possible solutionRegulatory compliance standards Controller Rectifier PossibleDiscipline Standards