Installation
Wall hanging accessory is available when you hang the monitor on the wall. Please follow the process mentioned on page
When you install the monitor on the ceiling or on the floor, please follow the process on page 23.
To a service technician
For safety, make sure the place has enough strength to hold the whole weight of the monitor and the frames (*1). If necessary, reinforce the place before installation.
At least two people are needed for installation. Be careful not to lose removed screws or parts.
Before starting installation, discuss well with customers about the position to install, and get their agreement. After installation, check the installation is correct and safe.
*1: About the material and the structure of the wall, ceiling and floor to install LCD monitor Where to install the LCD monitor
If the wall is made of thin plywood or plastered board, it cannot hold the weight.
The chart below shows adaptable anchors for each material. Please check well the structure and strength of the place to install, and choose the best method for safety.
Adaptable anchors / screws for each material
Material | Anchor | |
Plastered board | Impossible to install in Plastered board or Plywood board. Install in the tie beam instead of the wall. | |
Plywood board | ||
Whole anchor or Bolt | ||
Concrete | ||
Block |
| |
ALC | Tie lock anchor | |
Mortar | ||
| ||
Brick | Coach bolt (diameter: 6mm x length: 60mm) | |
Wooden pillar |
For assembly, a screwdriver with more than 300mm shaft is needed.
19